FIR06-00208
| INSP-Sprinkler Rough-in/Hydro | 5/22/2006 | 5/23/2006 | 5/24/2006 10:11:23 AM | P | CANC |
|
|
Cancel inspection per contractor, to be rescheduled when ready.
|
FIR06-00206
| INSP-Sprinkler Rough-in/Hydro | 5/22/2006 | 5/23/2006 | 5/24/2006 10:10:34 AM | P | FAIL |
|
|
Access to the tenant space was not made available, no inspection performed.
|
FIR06-00207
| INSP-Sprinkler Rough-in/Hydro | 5/22/2006 | 5/23/2006 | 5/24/2006 10:09:20 AM | P | FAIL |
|
|
The portion of install at the two new heads in the basement soffit has been concealed prior to inspection, also need to provide as-builts reflecting field changes for piping supply to new heads.
|
FIR06-00203
| INSP-Final Inspection | 5/18/2006 | 5/23/2006 | 5/23/2006 3:37:04 PM | A | PASS |
|
|
Fire alarm passed final field inspection.
|
FIR05-00482
| INSP-Final Inspection | 5/19/2006 | 5/23/2006 | 5/23/2006 3:36:20 PM | A | PASS |
|
|
As-builts for address changes verified on site, permit finaled.
|
FIR05-00871
| INSP-Final Inspection | 5/19/2006 | 5/23/2006 | 5/23/2006 3:35:17 PM | A | PASS |
|
|
Fire sprinkler work is satisfactory, drain calculations provided, permit finaled.
|
FIR05-00454
| INSP-Conference | 5/22/2006 | 5/23/2006 | 5/23/2006 3:33:03 PM | A | DONE |
|
|
On site discussion regarding work in progress for the permit.
|
FIR06-00287
| INSP-Sprinkler Rough-in | 5/22/2006 | 5/23/2006 | 5/23/2006 1:19:49 PM | P | FAIL |
|
|
Two heads as installed in the NE room of the tenant area are overspaced from an adjacent wall, also need to provide as-builts reflecting two deleted heads.
|
FIR06-00326
| INSP-Final Inspection | 5/22/2006 | 5/23/2006 | 5/23/2006 12:54:21 PM | P | PART |
|
|
Project is not ready for final inspection as walls and ceilings which create the separation between sprinklers are not complete at this time. Overhead rough-in is acceptable for cover.
|
FIR06-00320
| INSP-Sprinkler Rough-in | 5/23/2006 | 5/23/2006 | 5/23/2006 12:19:42 PM | P | FAIL |
|
|
One head at the 1st floor dining area is too close to a heat diffuser, two heads in the master bath 1st floor do not meet min. separation distances required, two drops are not installed in the main level bedroom, be aware of possible light fixture obstructions that may develop after fixture installation, one drop is missing in the basement hall, the supply, BFP, and riser are not installed at this time. Tenting for cold cavity protection appears adequate.
|
BLD05-01869
| FIRE-Sprinkler Rough-in | 5/22/2006 | 5/23/2006 | 5/23/2006 12:11:44 PM | A | DEFR |
|
|
This inspection request was for the fire sprinkler permit incorrectly called in under the BLD permit number. See comments for this inpection under FIR06-00320.
|
FIR06-00111
| INSP-Final Inspection | 5/19/2006 | 5/23/2006 | 5/23/2006 11:17:47 AM | A | PASS |
|
|
Fire alarm work is satisfactory, inspection passed, permit finaled.
|
FIR05-00285
| INSP-Final Inspection | 5/22/2006 | 5/23/2006 | 5/23/2006 11:16:52 AM | A | PASS |
|
|
Fire alarm work passed final inspection, one existing SD within the TI space is too close to an HVAC diffuser-head to be relocated and verified for approval at life safety inspection.
|
FIR05-00403
| FIR-Aging Inspection | 5/23/2006 | 5/23/2006 | 5/23/2006 9:49:47 AM | | DONE |
|
|
Building is still under construction, work in progress.
|
FIR05-00118
| INSP-Final Inspection | 5/23/2006 | 5/23/2006 | 5/23/2006 9:46:59 AM | P | PASS |
|
|
Fire alarm passed inspection, permit not "doc" finaled as previous inspection request was for alarm testing not final inspection.
|
FIR05-00516
| INSP-Final Inspection | 5/23/2006 | 5/23/2006 | 5/23/2006 9:45:16 AM | P | PASS |
|
|
Fire alarm passed inspection, permit not "doc" finaled as previous inspection request was for alarm testing not final inspection.
|
FIR05-00082
| INSP-Final Inspection | 5/23/2006 | 5/23/2006 | 5/23/2006 9:43:04 AM | P | PASS |
|
|
Fire alarm passed inspection, permit not "doc" finaled as previous inspection request was for alarm testing not final inspection.
|