Inspections for the day of: Tuesday, May 23, 2006.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD06-00764 BLD-Final5/23/20065/23/20065/23/2006 4:18:56 PMPDONE
debbie - pending fire final; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie. Allready inspected and ok by Dave H.
BLD06-01280 BLD-Footing5/23/20065/23/20065/23/2006 3:33:47 PMPFAIL
Maxine; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt. NO plans on site. needs to verify pl. needs to clean footing. c/n posted. do not place conc.
BLD06-00281 BLD-Footing5/22/20065/23/20065/23/2006 3:17:33 PMPPART
bob; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
BLD06-00007 BLD-Other5/23/20065/23/20065/23/2006 2:50:26 PMPPART
Scheduled by a contractor via Hello! on 5/23/2006 at 7:33:05 AM. Contact: ###-####. Masonry insp. for maintenance bldg. Inspected rebar from 0 to 4ft. elev. Masons are planning 8ft high lift grout. Contractor noted that engineer has approved high lift grout and wiil send letter. Special insp. to verify cleanouts and that all steel is tied into place prior to grouting.
BLD05-02406 BLD-Framing/Rough-in5/23/20065/23/20065/23/2006 2:26:08 PMPFAIL
Internet Inspection Request from: paul thornton. Installed washer boxes are not rated in 1hr wall. Complete all fire caulking. Install straps at cut plates.
BLD06-00805 BLD-Foundation5/23/20065/23/20065/23/2006 1:42:39 PMPPASS
Scheduled by a contractor via Hello! on 5/23/2006 at 7:33:18 AM. Contact: ###-####.
BLD06-00806 BLD-Foundation5/23/20065/23/20065/23/2006 1:42:22 PMPPASS
Scheduled by a contractor via Hello! on 5/23/2006 at 7:35:12 AM. Contact: ###-####.
BLD06-00808 BLD-Foundation5/23/20065/23/20065/23/2006 1:42:02 PMPPASS
Scheduled by a contractor via Hello! on 5/23/2006 at 7:36:54 AM. Contact: ###-####.
BLD04-03025 BLD-Framing/Rough-in5/22/20065/23/20065/23/2006 11:31:20 AMAFAIL
Scheduled by a contractor via Hello! on 5/22/2006 at 4:55:30 PM. Contact: ###-####.Needs to complete all fire caulking of penetrations at wall and floor ceiling assemblies 3rd floor North wing. Strap top plate 3rd floor north wing. Repair shaft at 3rd floor north wing.
BLD06-00889 BLD-Framing/Rough-in5/22/20065/23/20065/23/2006 10:43:30 AMANR
Scheduled by a contractor via Hello! on 5/22/2006 at 3:33:49 PM. Contact: ###-####. Approved plans not on site.
BLD06-01280 BLD-Footing5/22/20065/23/20065/23/2006 10:25:52 AMACANC
mike; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. rescheduled for this afternoon.
BLD05-02406 BLD-Framing/Rough-in5/23/20065/23/20065/23/2006 10:25:21 AMACANC
Internet Inspection Request from: paul thornton. rescheduled for this afternoon.
BLD05-01223 BLD-Final5/22/20065/23/20065/23/2006 9:22:53 AMAPASS
mark; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. ok for perm occ.
BLD02-01001 BLD-Aging Inspection5/23/20065/23/20065/23/2006 8:35:15 AM DONE
BLD06-00903 BLD-Final5/22/20065/23/20065/22/2006 2:08:29 PMAPASS
###-#### steve