BLD06-00764
| BLD-Final | 5/23/2006 | 5/23/2006 | 5/23/2006 4:18:56 PM | P | DONE |
|
|
debbie - pending fire final; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie. Allready inspected and ok by Dave H.
|
BLD06-01280
| BLD-Footing | 5/23/2006 | 5/23/2006 | 5/23/2006 3:33:47 PM | P | FAIL |
|
|
Maxine; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt. NO plans on site. needs to verify pl. needs to clean footing. c/n posted. do not place conc.
|
BLD06-00281
| BLD-Footing | 5/22/2006 | 5/23/2006 | 5/23/2006 3:17:33 PM | P | PART |
|
|
bob; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD06-00007
| BLD-Other | 5/23/2006 | 5/23/2006 | 5/23/2006 2:50:26 PM | P | PART |
|
|
Scheduled by a contractor via Hello! on 5/23/2006 at 7:33:05 AM. Contact: ###-####. Masonry insp. for maintenance bldg. Inspected rebar from 0 to 4ft. elev. Masons are planning 8ft high lift grout. Contractor noted that engineer has approved high lift grout and wiil send letter. Special insp. to verify cleanouts and that all steel is tied into place prior to grouting.
|
BLD05-02406
| BLD-Framing/Rough-in | 5/23/2006 | 5/23/2006 | 5/23/2006 2:26:08 PM | P | FAIL |
|
|
Internet Inspection Request from: paul thornton. Installed washer boxes are not rated in 1hr wall. Complete all fire caulking. Install straps at cut plates.
|
BLD06-00805
| BLD-Foundation | 5/23/2006 | 5/23/2006 | 5/23/2006 1:42:39 PM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 5/23/2006 at 7:33:18 AM. Contact: ###-####.
|
BLD06-00806
| BLD-Foundation | 5/23/2006 | 5/23/2006 | 5/23/2006 1:42:22 PM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 5/23/2006 at 7:35:12 AM. Contact: ###-####.
|
BLD06-00808
| BLD-Foundation | 5/23/2006 | 5/23/2006 | 5/23/2006 1:42:02 PM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 5/23/2006 at 7:36:54 AM. Contact: ###-####.
|
BLD04-03025
| BLD-Framing/Rough-in | 5/22/2006 | 5/23/2006 | 5/23/2006 11:31:20 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 5/22/2006 at 4:55:30 PM. Contact: ###-####.Needs to complete all fire caulking of penetrations at wall and floor ceiling assemblies 3rd floor North wing. Strap top plate 3rd floor north wing. Repair shaft at 3rd floor north wing.
|
BLD06-00889
| BLD-Framing/Rough-in | 5/22/2006 | 5/23/2006 | 5/23/2006 10:43:30 AM | A | NR |
|
|
Scheduled by a contractor via Hello! on 5/22/2006 at 3:33:49 PM. Contact: ###-####. Approved plans not on site.
|
BLD06-01280
| BLD-Footing | 5/22/2006 | 5/23/2006 | 5/23/2006 10:25:52 AM | A | CANC |
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. rescheduled for this afternoon.
|
BLD05-02406
| BLD-Framing/Rough-in | 5/23/2006 | 5/23/2006 | 5/23/2006 10:25:21 AM | A | CANC |
|
|
Internet Inspection Request from: paul thornton. rescheduled for this afternoon.
|
BLD05-01223
| BLD-Final | 5/22/2006 | 5/23/2006 | 5/23/2006 9:22:53 AM | A | PASS |
|
|
mark; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. ok for perm occ.
|
BLD02-01001
| BLD-Aging Inspection | 5/23/2006 | 5/23/2006 | 5/23/2006 8:35:15 AM | | DONE |
|
|
|
BLD06-00903
| BLD-Final | 5/22/2006 | 5/23/2006 | 5/22/2006 2:08:29 PM | A | PASS |
|
|
###-#### steve
|