FIR08-00365
| INSP-Final Inspection | 5/23/2008 | 5/23/2008 | 5/23/2008 4:52:51 PM | P | PASS |
|
|
K class PFE to be posted as discussed-will verify at life safety final, the hood suppression system functioned properly under test conditions, permit finaled.
|
BLD07-02935
| FIRE-Final Inspection | 5/22/2008 | 5/23/2008 | 5/23/2008 4:46:39 PM | A | FAIL |
|
|
Need to repair two non-functional EM lights at the kitchen and service area, one HVAC unit failed to shut down upon smoke detection, one EM light at the entry vestibule repaired while on site, remainder of items previously noted are acceptable.
|
FIR08-00163
| INSP-Sprinkler Rough-in | 5/23/2008 | 5/23/2008 | 5/23/2008 3:51:22 PM | P | PART |
|
|
UG fire supply line approved for cover with the exception of the thrust blocks not yet poured at the 90 and stub-in, also need to provide method for seismic clearance at the ductile riser and floor slab interface.
|
BLD08-00193
| FIRE-Final Inspection | 5/23/2008 | 5/23/2008 | 5/23/2008 3:45:30 PM | P | PART |
|
|
Site visit performed by S. Rogers. Acceptable for TOC. Maglocks on doors were approved by Mark Senteno, Asst. FM, to not have motion detection release, however, the required manual push button release does not maintain the doors unlocked for the required minimum 30 seconds (Ref IFC 1008.1.3.4 item 3). It relocks immediately upon release of the push button. For Temp Occy approval, the mag lock circuit was electrically bypassed (dedicated circuit breaker tripped, within the locked electrical panel). The P&R contact, Toby, indicated Parks will manually lock and unlock the doors each day, as they currently do at many other facilities, until they get the required timer installed and field approved by PDS/Fire. All other Fire/Life Safety items were satisfactory. SLR.
|
FIR07-00606
| INSP-Sprinkler Rough-in/Hydro | 5/22/2008 | 5/23/2008 | 5/23/2008 3:38:45 PM | A | PART |
|
|
OH hydrostatic testing for system #4 completed without pressure loss.
|
BLD06-00014
| FIRE-Final Inspection | 5/22/2008 | 5/23/2008 | 5/23/2008 3:21:36 PM | A | NR |
|
|
Inspection rescheduled.
|
FIR07-00702
| INSP-Sprinkler Rough-in | 5/22/2008 | 5/23/2008 | 5/23/2008 2:00:04 PM | A | PART |
|
|
See approved plans for areas okayed to date.
|
FIR08-00039
| INSP-Final Inspection | 5/22/2008 | 5/23/2008 | 5/23/2008 1:07:21 PM | A | CANC |
|
|
Mike B is the contact. Thanks Phone #: ###-#### Internet Inspection Request from: Stan Beus Overbooked, inspection rescheduled per phone call to contractor.
|
FIR08-00168
| INSP-Final Inspection | 5/22/2008 | 5/23/2008 | 5/23/2008 1:06:32 PM | A | CANC |
|
|
mike Phone #: ###-#### Overbooked, inspection rescheduled as agreed with sub and general contractors.
|
FIR07-00997
| INSP-Sprinkler Rough-in/Hydro | 5/22/2008 | 5/23/2008 | 5/23/2008 12:29:15 PM | A | PART |
|
|
Hydrostatic testing for the new system piping branch lines and pendent heads passed.
|
BLD07-02405
| FIRE-Conference | 5/23/2008 | 5/23/2008 | 5/23/2008 12:23:54 PM | P | DONE |
|
|
Discussion with contractor regarding project schedule and building permit shell and tenant permit approvals prior to elevator completion.
|
BLD08-00612
| FIRE-Final Inspection | 5/22/2008 | 5/23/2008 | 5/23/2008 12:00:15 PM | A | PASS |
|
|
Fire life safety completed satisfactory, however the building address per permit documents does not match the existing address numbers on the building (3152 per permit, 3156 per actual posted building #'s). Notified contractor to resolve the discrepancy prior to structural final approval for occupancy.
|
BLD08-00837
| FIRE-Final Inspection | 5/22/2008 | 5/23/2008 | 5/23/2008 11:56:06 AM | A | PASS |
|
|
Fire life safety inspection completed acceptable, no modifications to the fire sprinkler or alarm systems were necessary to complete BLD permit work.
|
BLD07-02796
| FIRE-Final Inspection | 5/22/2008 | 5/23/2008 | 5/23/2008 10:58:57 AM | A | PASS |
|
|
Main door mag locks tested okay, items on previously issued correction notice verified for compliance, door hardware at conference room #2 to be changed prior to structural final and verified at that time per discussion with contractor, remainder of life safety is satisfactory.
|
BLD07-02797
| FIRE-Final Inspection | 5/22/2008 | 5/23/2008 | 5/23/2008 10:54:40 AM | A | PASS |
|
|
Correction notice items are finished, life safety passed.
|
BLD07-02795
| FIRE-Final Inspection | 5/22/2008 | 5/23/2008 | 5/23/2008 10:53:48 AM | A | PASS |
|
|
Building shell life safety inspection passed, notified contractor to install fire lane signage per review notes prior to occupancy approval for the adjacent structure.
|