Inspections for the day of: Friday, May 23, 2008.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD06-03611 DOC - Permit Expired5/23/20085/23/20085/23/2008 4:53:20 PMPPASS
Tried to contact home owner and left messages on awnser machine. No return call as of friday afternnon. Permit has expired.
BLD07-02935 BLD-Final5/23/20085/23/20085/23/2008 4:47:52 PMPPEND
gary Phone #: ###-####. Will be ok for per or temp once life/safety goes perm or temp.
BLD08-00399 BLD-Foundation5/23/20085/23/20085/23/2008 4:43:08 PMPPART
john Note: pouring concrete at 1:00 pm Phone #: ###-####
BLD08-00277 BLD-Framing/Rough-in5/22/20085/23/20085/23/2008 3:42:24 PMAPASS
Scheduled by a contractor via Hello! on 5/22/2008 at 3:49:15 PM. Contact: ###-####.. Interior walls and harlids ok. no grid. Will call back on 1hr wall.
BLD07-03114 BLD-Framing/Rough-in5/22/20085/23/20085/23/2008 3:34:08 PMPFAIL
Scheduled by a contractor via Hello! on 5/22/2008 at 4:34:58 PM. Contact: ###-####. No approved plans or truss engineering on site. Also noted penetrations in laydown parapet and some areas were parapet was not 4ft.
BLD07-03112 BLD-Framing/Rough-in5/22/20085/23/20085/23/2008 3:32:37 PMPFAIL
Scheduled by a contractor via Hello! on 5/22/2008 at 4:36:44 PM. Contact: ###-####. No plans or truss engineering on site. Also noted penetrations in laydown parapet and some areas were laydown parapet was not 4ft.
BLD07-03113 BLD-Framing/Rough-in5/22/20085/23/20085/23/2008 3:31:25 PMPFAIL
Scheduled by a contractor via Hello! on 5/22/2008 at 4:38:32 PM. Contact: ###-####. No approved plans or truss engineering on site. Also noted penetrations in laydown parapet and some areas were parapet wa s not 4ft.
BLD08-00310 BLD-Framing/Rough-in5/22/20085/23/20085/23/2008 2:24:51 PMPFAIL
Randy; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt. Nail off all simpson hangars. Provide 2x6 squash block under 3ply in garage behind rim in basement. Ok to insul. c/n posted. Also needs to complete exterior moisture barrier rap.
BLD07-02935 BLD-Final5/22/20085/23/20085/23/2008 10:59:35 AMANR
Scheduled by a contractor via Hello! on 5/22/2008 at 5:05:56 PM. Contact: ###-####.
BLD07-01639 BLD-Energy code compliance5/22/20085/23/20085/23/2008 10:53:10 AMAPASS
insulation inspection Phone #: ###-#### Internet Inspection Request from: Jessica Noland
BLD08-00247 BLD-Framing/Rough-in5/22/20085/23/20085/23/2008 10:52:53 AMAPASS
Scheduled by a contractor via Hello! on 5/22/2008 at 12:10:21 PM. Contact: ###-####.