PLM11-00885
| Final | 5/23/2011 | 5/23/2011 | 5/23/2011 4:49:58 PM | P | PASS |
|
|
|
PLM11-00885
| Water and/or Sewer | 5/20/2011 | 5/23/2011 | 5/23/2011 4:49:18 PM | P | PASS |
|
|
Chris or ###-#### Jerry Phone #: ###-####
|
PLM11-00875
| Sprinkler (Final) | 5/23/2011 | 5/23/2011 | 5/23/2011 4:19:05 PM | P | PASS |
|
|
peter Phone #: ###-####
|
PLM11-00503
| Other | 5/23/2011 | 5/23/2011 | 5/23/2011 2:45:51 PM | P | PASS |
|
|
need to raise avb or put on RPBP.........ds
|
PLM11-00361
| Final | 5/23/2011 | 5/23/2011 | 5/23/2011 2:14:55 PM | P | PASS |
|
|
brandon Phone #: ###-####
|
PLM11-00879
| Sprinkler (Final) | 5/20/2011 | 5/23/2011 | 5/23/2011 1:28:42 PM | P | PASS |
|
|
Will be ready after 12pm. Thank you. Phone #: ###-#### >> Inspection requested via web by Franz Witte
|
MIS10-00058
| PLM-Final | 5/23/2011 | 5/23/2011 | 5/23/2011 10:27:24 AM | A | PASS |
|
|
vacuum breakers installed ok on eye wash..........ds
|
PLM11-00890
| Final | 5/23/2011 | 5/23/2011 | 5/23/2011 9:58:58 AM | A | PASS |
|
|
|
PLM11-00890
| Plumbing Rough-in | 5/20/2011 | 5/23/2011 | 5/23/2011 9:58:40 AM | A | CANC |
|
|
Dacia-Please call prior to inspection Phone #: ###-####
|
GCP11-00051
| GCP-Water and/or Sewer | 5/20/2011 | 5/23/2011 | 5/23/2011 9:43:30 AM | A | PASS |
|
|
Sewer LineHeidi @ ###-####AM Inspection
|
PLM11-00571
| Final | 5/20/2011 | 5/23/2011 | 5/23/2011 9:10:31 AM | A | PASS |
|
|
1st am if possible. Building inspection is scheduled for 8am. >> Inspection requested via web by sean rocke
|