Inspections for the day of: Monday, May 23, 2011.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC10-00616 Conference5/20/20115/23/20115/23/2011 4:08:53 PMADONE
PErmit finaled.
ESC10-00616 DOC - Permit Finaled5/23/20115/23/20115/23/2011 4:08:43 PMPPASS
ESC11-00193 Site Preparation5/16/20115/23/20115/23/2011 4:08:29 PMANR
ESC11-00267 Site Preparation5/9/20115/23/20115/23/2011 4:08:11 PMAPASS
ESC10-00904 Tracking Control5/23/20115/23/20115/23/2011 10:01:07 AMAFAIL
Correction Notice: (message to RP who responded via text message)
1. Clean up all tracked sediment and debris off of all hard surfaces in the culdisac out to Sawmill Way.
2. Clean all sediment and debris off of all hard surfaces within the whole project area.
Failure to comply with the given notice, will result in a Stop Work Order. Will re-inspect on 5/24/2011PM.
ESC10-00573 General Inspection5/23/20115/23/20115/23/2011 9:56:46 AM PASS
ESC10-00430 General Inspection5/23/20115/23/20115/23/2011 9:56:18 AM PART
waiting on back section of the lot to achieve the stabilization requirements to final the permit.
ESC11-00257 Site Preparation5/23/20115/23/20115/23/2011 9:38:21 AM PASS
ESC11-00189 Site Preparation5/23/20115/23/20115/23/2011 8:38:35 AM NR
Left message with the expired RP to get the start date, and to check if he has scheduled himself for the next available RP class. waiting on a call back. Will check up in one week.