FIR12-00253
| INSP-Sprinkler Rough-in | 5/23/2012 | 5/23/2012 | 5/23/2012 4:54:15 PM | P | PART |
|
|
Overhead rough-in completed satisfactory for the NW corner existing office area- okay for ceiling cover. See plans for clouded and dated location.
|
BLD12-00955
| FIRE-Alarm Testing | 5/23/2012 | 5/23/2012 | 5/23/2012 4:51:16 PM | P | PART |
|
|
|
BLD12-00772
| FIRE-Final Inspection | 5/23/2012 | 5/23/2012 | 5/23/2012 4:50:50 PM | A | NR |
|
|
Final scheduled 5/24 AM.
|
BLD11-00407
| FIRE-Conference | 5/23/2012 | 5/23/2012 | 5/23/2012 4:48:54 PM | A | DONE |
|
|
Regarding scope of permit attatched fire sprinkler work for replacement of existing system piping.
|
BLD12-00134
| FIRE-Final Inspection | 5/22/2012 | 5/23/2012 | 5/23/2012 12:20:45 PM | A | CANC |
|
|
Phone #: ###-#### >> Inspection requested via web by Todd Blackwell Inspection cancelled from web by: Todd Blackwell
|
BLD12-00629
| FIRE-Final Inspection | 5/22/2012 | 5/23/2012 | 5/23/2012 12:07:40 PM | A | PASS |
|
|
Life safety inspection completed satisfactory. One additional PFE posted while on site.
|