ESC16-01233
| General Inspection | 5/23/2017 | 5/23/2017 | 5/24/2017 11:38:05 AM | | CANC |
|
|
|
ESC16-01651
| General Inspection | 5/9/2017 | 5/23/2017 | 5/24/2017 11:36:47 AM | P | PASS |
|
|
No activity at time of inspection. No discharges, trackout or fugitve dust observed. Permit sign and SWPPP info posted. Approved.
|
ESC17-00625
| Tracking Control | 5/22/2017 | 5/23/2017 | 5/24/2017 11:36:07 AM | P | PEND |
|
|
initial trackout cleaned up. Need to have another sweeper this week after hauling is done. Loose sediment and dust on Roe and at Roe & State Street. Restrict access out of site only through the rock construction entrance.
|
ESC16-01354
| General Inspection | 5/23/2017 | 5/23/2017 | 5/23/2017 2:30:19 PM | P | PASS |
|
|
Vertictal construction in progress and on interior access road. Perimeter curb and gutter installation is near complete. No trackout or discharges observed on Myrtle or 11th street. No fugitive dust issues observed or reported. Approved.
|
ESC16-01446
| General Inspection | 5/23/2017 | 5/23/2017 | 5/23/2017 2:29:13 PM | P | PASS |
|
|
Vertictal construction in progress. Perimeter curb and gutter installation is near complete. No trackout or discharges observed around perimeter.
|
ESC15-01483
| General Inspection | 5/23/2017 | 5/23/2017 | 5/23/2017 12:21:28 PM | | PASS |
|
|
WIP on final landscaping and site improvements. Not ready for final
|
ESC17-00525
| Conference | 5/23/2017 | 5/23/2017 | 5/23/2017 9:11:15 AM | A | PASS |
|
|
Contractor called to inform project will begin. Detached garage on flat site with alley access. Reveiwed housekeeping and pollution prevention BMPs. No site preparation inspection required. Approved to proceed.
|