FIR19-00190
| INSP-Sprinkler Rough-in | 5/22/2019 | 5/23/2019 | 5/23/2019 4:40:27 PM | P | PASS |
|
|
Rough to cover inspection for overhead fire sprinkler piping complete. All tenting insualtion in place at time of inspection, cover is approved.
Josh Eaton is the contact. He requests that he be contacted ahead of time so him and the inspector can schedule a time to meet at the job site. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
MIS19-00134
| FIR-Conference | 5/23/2019 | 5/23/2019 | 5/23/2019 12:58:18 PM | P | FAIL |
|
|
Fire sprinkler modifications have been completed without an issued FIR permit. No permit for electrical work required for fire pump. No plumbing permit for the required floor drain in fire pump room. No BLD permit for fire pump room. Stop work order for fire sprinkler modifications has been placed in the fire pump location, contractor has been verbally informed that a stop work order has been placed.
work being done is structural, ele & fire sprinkler without permits
|
FIR19-00242
| INSP-Final Inspection | 5/20/2019 | 5/23/2019 | 5/23/2019 12:16:54 PM | A | CANC |
|
|
Inspection request cancelled per conversation with point of contact, fire panel had troubles that were associated with the fire alarm system that could not be repaired before inspection, this request is cancelled.
Please call 30 minutes prior to inspection - Joe ###-#### Phone #: ###-#### Inspection requested via web by Kristin Dolan
|
FIR19-00269
| INSP-Sprinkler Rough-in | 5/22/2019 | 5/23/2019 | 5/23/2019 12:15:48 PM | A | PASS |
|
|
All tenting in place at time of inspection, cover for overhead fire sprinkler piping approved, sticker for cover approvel placed on window with other trade associated stickers.
This a rough-in inspection for tenting. Phone #: ###-#### Inspection requested via web by Daniel Buccino
|
FIR18-00744
| INSP-Sprinkler Rough-in | 5/23/2019 | 5/23/2019 | 5/23/2019 9:45:19 AM | A | PART |
|
|
Rough to cover inspection for overhead fire sprinkler piping complete, changes were required outside of what was shown on the city approved drawings, as-builts will be submitted showing changes. Cover is approved at the contractors discretion, if changes need to be made due to as-builts not meeting requirements then cover material will need to be removed for corrections. Plastic sheeting used for tenting, all tenting in place at time of inspection.
|
FIR18-00744
| INSP-Sprinkler Rough-in/Hydro | 5/22/2019 | 5/23/2019 | 5/23/2019 9:41:57 AM | A | DONE |
|
|
Hydrostatic test for overhead fire sprinkler piping witnessed at 140 psi (static pressure is required at a minimum, the hydro was completed with pressure above static city pressure), no pressure loss was observed.
Rough/hydro and tenting inspection. Please call James before heading out.
Thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
BLD18-01143
| FIRE-Final Inspection | 5/22/2019 | 5/23/2019 | 5/23/2019 9:03:22 AM | A | FAIL |
|
|
City approved drawings that were on site during inspection did not show tray wash remodel.
David Phone #: ###-####
|