ELE00-01538
| Electrical Rough-In | 5/23/2000 | 5/24/2000 | 5/24/2000 12:00:00 AM | A | PART |
|
|
###-#### pager Elect and mech room 5/25/00 7:55:01 AM
|
ELE00-01862
| Final | 5/23/2000 | 5/24/2000 | 5/24/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 05/23/2000 at 13:06:20. Contact: ###-####.
|
ELE00-01125
| Electrical Rough-In | 5/23/2000 | 5/24/2000 | 5/24/2000 12:00:00 AM | A | FAIL |
|
|
conference ###-#### Service grounding idendification of #6 and smaller 250-148 support raceways and boxes Receps above cord connected lights 5/25/00 7:54:40 AM
|
ELE00-01902
| Electrical Rough-In | 5/23/2000 | 5/24/2000 | 5/24/2000 12:00:00 AM | A | PART |
|
|
Benchmark ###-#### Conf only 5/25/00 7:55:56 AM
|
ELE00-01105
| Final | 5/23/2000 | 5/24/2000 | 5/24/2000 12:00:00 AM | A | NH |
|
|
garage door is open ###-####
|
ELE00-01804
| Final | 5/23/2000 | 5/24/2000 | 5/24/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 05/23/2000 at 17:45:12. Contact: ###-####.
|
ELE00-01611
| Permanent Service | 5/24/2000 | 5/24/2000 | 5/24/2000 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 05/24/2000 at 07:32:57. Contact: ###-####. no concrete encased electrode 5/25/00 3:56:23 PM
|
ELE00-01860
| Final | 5/24/2000 | 5/24/2000 | 5/24/2000 12:00:00 AM | P | FAIL |
|
|
###-#### Wrong address 5/25/00 12:47:12 PM
|
ELE00-01921
| Electrical Rough-In | 5/24/2000 | 5/24/2000 | 5/24/2000 12:00:00 AM | P | PART |
|
|
this is for 3 recessed cans right now.Front Bulk head Upstairs south of the Bon Marche' Mike ###-####
|