BLD00-00190
| FIRE-Final Inspection | 5/23/2000 | 5/24/2000 | 5/24/2000 12:00:00 AM | A | PASS |
|
|
Joel, ###-####
|
FIR99-00169
| INSP-Sprinkler Rough-in | 5/23/2000 | 5/24/2000 | 5/24/2000 12:00:00 AM | A | PART |
|
|
John ###-#### Ok to cover grid ceiling areas. Need to recheck sway bracing on second floor. 5/24/00 3:03:39 PM
|
BLD99-02158
| FIRE-Conference | 5/24/2000 | 5/24/2000 | 5/24/2000 12:00:00 AM | A | PART |
|
|
Ok to use Deli Type 1 hood. Suppression system tested ok. 5/24/00 3:03:59 PM
|
FIR00-00021
| INSP-Sprinkler Rough-in | 5/24/2000 | 5/24/2000 | 5/24/2000 12:00:00 AM | A | PART |
|
|
okay to cover griided ceiling areas only. earthquaking on mains must go to beams and not walls
|
FIR00-00021
| INSP-Supply line flush | 5/24/2000 | 5/24/2000 | 5/24/2000 12:00:00 AM | P | PASS |
|
|
flush okay
|
BLD99-01529
| FIRE-Final Inspection | 5/23/2000 | 5/24/2000 | 5/24/2000 12:00:00 AM | P | PASS |
|
|
Doug ###-#### ext 133 please call first
|