MEC00-00857
| Rough-in | 5/23/2001 | 5/24/2001 | 5/24/2001 12:00:00 AM | A | PART |
|
|
re-insp --r/i -amanda ###-#### 2nd floor r/i ok 5/24/2001 9:21:22 AM
|
MEC01-01303
| Pressure Test | 5/23/2001 | 5/24/2001 | 5/24/2001 12:00:00 AM | A | PASS |
|
|
###-#### greg reinspection
|
MEC01-01550
| Final | 5/23/2001 | 5/24/2001 | 5/24/2001 12:00:00 AM | A | PART |
|
|
###-#### r/i ok 5/24/2001 11:55:17 AM
|
MEC01-01463
| Rough-in | 5/23/2001 | 5/24/2001 | 5/24/2001 12:00:00 AM | A | FAIL |
|
|
Kirt ###-#### c/n posted 5/24/2001 11:07:04 AM
|
MEC01-01500
| Final | 5/24/2001 | 5/24/2001 | 5/24/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 05/24/2001 at 05:51:03. Contact: ###-####.
|
MEC01-00372
| Final | 5/24/2001 | 5/24/2001 | 5/24/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 05/24/2001 at 08:12:46. Contact: ###-####. correction has not been made 5/24/2001 3:31:23 PM
|
MEC00-02884
| Final | 5/24/2001 | 5/24/2001 | 5/24/2001 12:00:00 AM | P | PASS |
|
|
###-####
|
MEC01-00540
| Final | 5/24/2001 | 5/24/2001 | 5/24/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 05/24/2001 at 08:53:55. Contact: ###-####. c/n posted 5/24/2001 2:49:59 PM
|
MEC01-01557
| Pressure Test | 5/24/2001 | 5/24/2001 | 5/24/2001 12:00:00 AM | P | FAIL |
|
|
###-#### remove gas pipe from r/a 5/24/2001 3:37:01 PM
|
MEC01-01556
| Final | 5/24/2001 | 5/24/2001 | 5/24/2001 12:00:00 AM | P | FAIL |
|
|
Paul ###-#### need a 60 psi test use listed gas connector 5/24/2001 3:30:34 PM
|
MEC01-01476
| Final | 5/24/2001 | 5/24/2001 | 5/24/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 05/24/2001 at 11:13:02. Contact: ###-####.
|