BLD00-03316
| BLD-Framing/Rough-in | 5/23/2001 | 5/24/2001 | 5/24/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 05/23/2001 at 13:41:52. Contact: ###-####....need eng's clarification/as-builts. ok to rock soffits 5/24/2001 4:11:53 PM
|
BLD01-00140
| BLD-Final | 5/23/2001 | 5/24/2001 | 5/24/2001 12:00:00 AM | A | FAIL |
|
|
###-####; c/n door hdwe, signage; storae racks, etc 5/24/2001 4:07:50 PM
|
MEC01-01400
| Rough-in | 5/23/2001 | 5/24/2001 | 5/24/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 05/23/2001 at 15:57:30. Contact: ###-####....c/n re 1" at b-vent/ducts at gar lid; chk w/ insul insp? 5/24/2001 10:39:03 AM
|
MEC01-01400
| Pressure Test | 5/23/2001 | 5/24/2001 | 5/24/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 05/23/2001 at 15:57:43. Contact: ###-####....wrap pipe thru wall 5/24/2001 10:39:20 AM
|
MEC01-01445
| Rough-in | 5/23/2001 | 5/24/2001 | 5/24/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 05/23/2001 at 15:58:38. Contact: ###-####...ducts & flue only, support/insulate line-set & plenums 5/24/2001 9:50:59 AM 5/24/2001 9:52:03 AM
|
MEC01-01445
| Pressure Test | 5/23/2001 | 5/24/2001 | 5/24/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 05/23/2001 at 15:58:48. Contact: ###-####...no gas piping installed; do not cover 5/24/2001 9:52:37 AM
|
BLD00-02390
| BLD-Conference | 5/24/2001 | 5/24/2001 | 5/24/2001 12:00:00 AM | A | PART |
|
|
Added by Inspector: 340 On 5/24/2001 8:00:10 AM w/ bldr re final...chk w/ mgmt...
|
BLD01-00891
| BLD-Framing/Rough-in | 5/24/2001 | 5/24/2001 | 5/24/2001 12:00:00 AM | P | PART |
|
|
kelly ###-#### work please call before going out; ok to cover, chkint sheathing at final 5/24/2001 4:06:14 PM
|
BLD00-03031
| BLD-Final | 5/24/2001 | 5/24/2001 | 5/24/2001 12:00:00 AM | P | PASS |
|
|
John Wyman ###-####
|
BLD01-01236
| BLD-Framing/Rough-in | 5/24/2001 | 5/24/2001 | 5/24/2001 12:00:00 AM | P | CANC |
|
|
5/24/2001 11:35:30 AM
|
BLD98-03343
| BLD-Conference | 5/24/2001 | 5/24/2001 | 5/24/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 340 On 5/24/2001 4:19:09 PM w/ Mike of Jordan-Wilcomb
|
MEC01-00817
| Conference | 5/24/2001 | 5/24/2001 | 5/24/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 340 On 5/24/2001 4:16:57 PM w/ Fred of TML
|
BLD01-00172
| BLD-Conference | 5/24/2001 | 5/24/2001 | 5/24/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 340 On 5/24/2001 5:09:00 PM advised owner re roof framing: need rafter ties at plate or balloon frame walls.
|
BLD01-00172
| BLD-Footing | 5/24/2001 | 5/24/2001 | 5/24/2001 12:00:00 AM | P | PART |
|
|
drew ###-####
|
BLD98-03343
| BLD-Final | 5/21/2001 | 5/24/2001 | 5/24/2001 12:00:00 AM | P | FAIL |
|
|
Please call Tim Wilcomb @ ###-#### 1st so he can meet you there...c/n need all plans/ notes 5/25/2001 11:03:26 AM
|