ELE01-01685
| Electrical Rough-In | 5/23/2001 | 5/24/2001 | 5/24/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 05/23/2001 at 12:01:01. Contact: .
dennis: ###-####. conference; mounting of j-boxes and gutters. 5/24/2001 8:50:45 AM
|
ELE01-01709
| Electrical Rough-In | 5/23/2001 | 5/24/2001 | 5/24/2001 12:00:00 AM | A | PASS |
|
|
###-####. upstairs bathrm. r/i. ok. 5/24/2001 9:26:08 AM
|
ELE01-00430
| Electrical Rough-In | 5/23/2001 | 5/24/2001 | 5/24/2001 12:00:00 AM | A | CANC |
|
|
Zach ###-####. request should be for a final
inspection. 5/24/2001 9:53:00 AM
|
ELE01-00430
| Final | 5/24/2001 | 5/24/2001 | 5/24/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 403 On 5/24/2001 9:54:17 AM completed. ok.
|
ELE01-01587
| Electrical Rough-In | 5/24/2001 | 5/24/2001 | 5/24/2001 12:00:00 AM | A | PASS |
|
|
for cover Chuck ###-####. framed walls ele r/i. (does not include service panel/ disconnects by others.) 5/24/2001 1:37:53 PM
|
ELE01-00502
| Final | 5/24/2001 | 5/24/2001 | 5/24/2001 12:00:00 AM | P | PASS |
|
|
fn john ###-####. installed approved light fixtures. completed. ok. 5/24/2001 3:05:11 PM
|
ELE01-01532
| Electrical Rough-In | 5/24/2001 | 5/24/2001 | 5/24/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 05/24/2001 at 08:57:50. Contact: ###-####.conference: branch circuits. 5/24/2001 2:29:21 PM
|
ELE01-01687
| Temporary Service | 5/24/2001 | 5/24/2001 | 5/24/2001 12:00:00 AM | P | PASS |
|
|
Ken ###-####. perm/svc, corrections completed. ok.
t/s oh CSDI CONSTRUCTION INC #1687 5/24/2001 3:25:21 PM
|
ELE01-01256
| Electrical Rough-In | 5/24/2001 | 5/24/2001 | 5/24/2001 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 05/24/2001 at 09:17:16. Contact: ###-####. called in wrong address and permit number. contractor will reschedule. 5/24/2001 4:06:10 PM
|