FIR01-00262
| INSP-Final Inspection | 5/23/2001 | 5/24/2001 | 5/24/2001 12:00:00 AM | A | PASS |
|
|
Rob ###-####
|
FIR00-00546
| INSP-Final Inspection | 5/24/2001 | 5/24/2001 | 5/24/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 409 On 5/24/2001 11:00:22 AM
|
MIS01-00088
| FIR-Final | 5/24/2001 | 5/24/2001 | 5/24/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 409 On 5/24/2001 11:59:05 AM
|
FIR01-00126
| INSP-Supply line flush | 5/24/2001 | 5/24/2001 | 5/24/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 05/24/2001 at 08:27:21. Contact: ###-####. underground installed is 8 inch per plans but PIV not installed. Shilo notified per telephone call to Pepper 5/24/2001 11:37:29 AM
|
FIR01-00172
| INSP-Sprinkler Rough-in | 5/24/2001 | 5/24/2001 | 5/24/2001 12:00:00 AM | P | PART |
|
|
###-#### pager okay to cover the lunch room. upper mezzanine and assembly room only 5/25/2001 5:58:53 AM
|
FIR00-00297
| INSP-Final Inspection | 5/24/2001 | 5/24/2001 | 5/24/2001 12:00:00 AM | P | FAIL |
|
|
Bob ###-#### damper access doors; tamper switches not working; flow switch not working; c/n issued 5/25/2001 6:00:09 AM
|