Inspections for the day of: Thursday, May 24, 2001.
Number of inspections: 6
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRick Jackson
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR01-00262 INSP-Final Inspection5/23/20015/24/20015/24/2001 12:00:00 AMAPASS
Rob ###-####
FIR00-00546 INSP-Final Inspection5/24/20015/24/20015/24/2001 12:00:00 AMAPASS
Added by Inspector: 409 On 5/24/2001 11:00:22 AM
MIS01-00088 FIR-Final5/24/20015/24/20015/24/2001 12:00:00 AMAPASS
Added by Inspector: 409 On 5/24/2001 11:59:05 AM
FIR01-00126 INSP-Supply line flush5/24/20015/24/20015/24/2001 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 05/24/2001 at 08:27:21. Contact: ###-####. underground installed is 8 inch per plans but PIV not installed. Shilo notified per telephone call to Pepper 5/24/2001 11:37:29 AM
FIR01-00172 INSP-Sprinkler Rough-in5/24/20015/24/20015/24/2001 12:00:00 AMPPART
###-#### pager okay to cover the lunch room. upper mezzanine and assembly room only 5/25/2001 5:58:53 AM
FIR00-00297 INSP-Final Inspection5/24/20015/24/20015/24/2001 12:00:00 AMPFAIL
Bob ###-#### damper access doors; tamper switches not working; flow switch not working; c/n issued 5/25/2001 6:00:09 AM