Inspections for the day of: Thursday, May 24, 2001.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorSteven Webb
Title 
Phone #794-9491
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-00657 BLD-Other5/23/20015/24/20015/24/2001 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 05/23/2001 at 09:14:04. Contact: . C/N posted-- 5/24/2001 10:16:38 AM
BLD01-00498 BLD-Framing/Rough-in5/23/20015/24/20015/24/2001 12:00:00 AMAPART
Matt ###-#### C/N ok to insulate 5/24/2001 9:53:43 AM
BLD01-00198 BLD-Final5/23/20015/24/20015/24/2001 12:00:00 AMAFAIL
reinspection ###-#### C/N--need mechanical sign off 5/24/2001 10:59:25 AM
BLD01-00775 BLD-Framing/Rough-in5/23/20015/24/20015/24/2001 12:00:00 AMAPART
Pat ###-#### C/N posted-ok to insulate 5/24/2001 8:20:23 AM
BLD01-00960 BLD-Framing/Rough-in5/23/20015/24/20015/24/2001 12:00:00 AMAPASS
Jerry ###-#### ok to cover 5/24/2001 7:59:10 AM
BLD01-00335 BLD-Footing5/23/20015/24/20015/24/2001 12:00:00 AMAPART
###-#### wip 5/24/2001 10:53:10 AM
BLD00-03569 BLD-Foundation5/23/20015/24/20015/24/2001 12:00:00 AMAPASS
Duane ###-#### Already poured--contractor said had special inspection (MTI). 5/24/2001 11:23:59 AM
BLD01-00897 BLD-Framing/Rough-in5/23/20015/24/20015/24/2001 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 05/23/2001 at 18:35:14. Contact: ###-####. SHEAR-C/N posted--verify hd installation completed at framing--ok to side. 5/24/2001 8:43:11 AM
MEC01-01434 Final5/24/20015/24/20015/24/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 05/24/2001 at 05:51:35. Contact: ###-####.
BLD01-00558 BLD-Final5/24/20015/24/20015/24/2001 12:00:00 AMPPASS
pat ###-#### C. of C. #21424 issued. 5/24/2001 2:06:42 PM
BLD01-00378 BLD-Final5/24/20015/24/20015/24/2001 12:00:00 AMPPASS
pat ###-#### C. of C. #21425 issued. 5/24/2001 2:05:57 PM
BLD01-01077 BLD-Footing5/24/20015/24/20015/24/2001 12:00:00 AMPNR
###-#### 5/24/2001 1:04:36 PM
BLD00-02026 BLD-Framing/Rough-in5/24/20015/24/20015/24/2001 12:00:00 AMPPASS
grid ceiling insp -- dutch ###-####
BLD00-01683 BLD-Framing/Rough-in5/24/20015/24/20015/24/2001 12:00:00 AMPPART
c/n posted, ok to insulate pending mech. pass. also pending arch. approval on shear 5/24/2001 12:41:54 PM
MEC01-01345 Final5/18/20015/24/20015/23/2001 12:00:00 AMACANC
before 10:30 please Martin ###-#### Disp set to [CANC] by a contractor via Hello! on 05/23/2001 at 08:01:27.