Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-03425 BLD-Footing5/23/20015/24/20015/24/2001 12:00:00 AMAPASS
Bob ###-#### work #
BLD00-02822 BLD-Framing/Rough-in5/23/20015/24/20015/24/2001 12:00:00 AMAPART
shear wall John ###-#### ok to cover ext walls all but for the two ends problems with straps 5/24/2001 12:36:53 PM
BLD00-03593 BLD-Framing/Rough-in5/23/20015/24/20015/24/2001 12:00:00 AMANR
shafts Carl ###-####
BLD01-01290 BLD-Conference5/23/20015/24/20015/24/2001 12:00:00 AMAFAIL
PLACE STOP WORK ORDER MOVED WITHOUT PERMIT. CHARGE DOUBLE FEE. PER 325 5/24/2001 9:15:28 AM
BLD00-03079 BLD-Foundation5/23/20015/24/20015/24/2001 12:00:00 AMAPASS
Larry ###-####
BLD01-01250 BLD-Foundation5/23/20015/24/20015/24/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 05/23/2001 at 16:50:14. Contact: ###-####.
BLD01-01273 BLD-Foundation5/24/20015/24/20015/24/2001 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 05/24/2001 at 06:46:56. Contact: ###-####. W.I.P 5/24/2001 9:16:18 AM
MEC01-01549 Final5/23/20015/24/20015/24/2001 12:00:00 AMAPASS
###-####
BLD01-00435 BLD-Framing/Rough-in5/23/20015/24/20015/24/2001 12:00:00 AMAPASS
Dennis ###-#### front wall and restroom walls 5/24/2001 10:28:15 AM
BLD01-00563 BLD-Energy code compliance5/23/20015/24/20015/24/2001 12:00:00 AMPPASS
Ron ###-####
BLD01-00417 BLD-Final5/22/20015/24/20015/24/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 05/22/2001 at 14:15:17. Contact: ###-####. 5/24/2001 1:04:28 PM ok for perm occ 5/24/2001 1:56:30 PM
BLD01-00592 BLD-Framing/Rough-in5/23/20015/24/20015/24/2001 12:00:00 AMPNR
Scheduled by a contractor via Hello! on 05/23/2001 at 08:12:00. Contact: ###-####.
BLD01-00309 BLD-Framing/Rough-in5/23/20015/24/20015/24/2001 12:00:00 AMPNR
wall\###-####
BLD01-00290 BLD-Framing/Rough-in5/23/20015/24/20015/24/2001 12:00:00 AMPPART
wall MTI on site checking rebar inspector was using rebar shop drwgs not city approve struc. I found diff in tow inspector will go back over tilt up pannels with struc set 5/24/2001 3:08:08 PM
BLD01-00333 BLD-Final5/24/20015/24/20015/24/2001 12:00:00 AMPPASS
Johnny ###-#### late pm 6969 cc#20346 issued 5/24/2001 3:37:51 PM
BLD01-00515 BLD-Final5/24/20015/24/20015/24/2001 12:00:00 AMPNR
dave miller ###-#### --fire also for the pm need fire final 5/24/2001 3:47:27 PM
MEC01-01558 Pressure Test5/24/20015/24/20015/24/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 05/24/2001 at 11:15:44. Contact: .
BLD01-00563 BLD-Framing/Rough-in5/24/20015/24/20015/24/2001 12:00:00 AMPPASS
Added by Inspector: 425 On 5/24/2001 1:22:15 PM