Inspections for the day of: Friday, May 24, 2002.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRuss Owen
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-01957 BLD-Foundation5/23/20025/24/20025/24/2002 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 05/23/2002 at 08:56:10. Contact: shane ###-#### Continous footing has not been poured as per approved plans. also hold downs have not been installed.( This footing and wall is allready poured). Also now owner wants to add 2nd floor. 5/24/2002 1:07:59 PM
BLD02-01054 BLD-Foundation5/23/20025/24/20025/24/2002 12:00:00 AMAPART
TONY ###-####
BLD02-00630 BLD-Framing/Rough-in5/23/20025/24/20025/24/2002 12:00:00 AMAPASS
###-####- zigy or mike
BLD01-02961 BLD-Foundation5/23/20025/24/20025/24/2002 12:00:00 AMAFAIL
BRENT ###-####. Need tohave engineer clairify (2) #4 bars in footing top and bottom of grade beams, also ok fill under all grade beams with out compaction report , also approve 2 part por for gragde beams , c/n issued . 5/24/2002 11:12:48 AM
BLD02-01203 BLD-Framing/Rough-in5/23/20025/24/20025/24/2002 12:00:00 AMAPART
DREW ###-#### CALL BEFORE GOING OUT SO DREW CAN BE THERE... NEEDS THE ELECTRICAL INSPECTED PRIOR TO INSULATION ,LEFT C/N TO RECALL FOR INSULATION INSPECTION AND OBTAIN ELE.5/24/2002 10:41:56 AM TED 5/24/2002 10:41:58 AM 5/24/2002 10:42:39 AM
BLD02-00847 BLD-Framing/Rough-in5/23/20025/24/20025/24/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 05/23/2002 at 22:27:21. Contact: ###-####.
BLD02-00972 BLD-Footing5/24/20025/24/20025/24/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 05/24/2002 at 07:13:47. Contact: ###-####.
BLD01-00308 BLD-Final5/23/20025/24/20025/24/2002 12:00:00 AMAFAIL
###-####. c/n posted. 5/24/2002 11:28:56 AM
BLD02-00067 BLD-Framing/Rough-in5/23/20025/24/20025/24/2002 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 05/23/2002 at 15:10:47. Contact: ###-####.. Needs all items done on prior c/n also it still has no electrical approval. 5/24/2002 3:24:33 PM
BLD02-00839 BLD-Final5/24/20025/24/20025/24/2002 12:00:00 AMPNR
###-#### Shannon after 4 please. needs all other inspections. 5/24/2002 1:27:05 PM
BLD01-00308 BLD-Final5/24/20025/24/20025/24/2002 12:00:00 AMPPASS
###-#### DARWIN ok perm oc. 5/24/2002 4:00:05 PM
MEC02-01417 Pressure Test5/24/20025/24/20025/24/2002 12:00:00 AMPPASS
STEVE ###-####
BLD01-02626 BLD-Final5/23/20025/24/20025/24/2002 12:00:00 AMPPASS
###-#### Linda