MEC02-01295
| Rough-in | 5/24/2002 | 5/24/2002 | 5/24/2002 12:00:00 AM | A | PART |
|
|
Added by Inspector: 425 On 5/24/2002 10:23:50 AM ok to cover but still needs a pressure test on gas line
|
BLD02-00720
| BLD-Footing | 5/23/2002 | 5/24/2002 | 5/24/2002 12:00:00 AM | A | PART |
|
|
###-#### ftg for area south of 9th st ok to pour 5/24/2002 9:55:56 AM
|
BLD02-01105
| BLD-Footing | 5/23/2002 | 5/24/2002 | 5/24/2002 12:00:00 AM | A | PASS |
|
|
CHUCK ###-####
|
MEC02-01295
| Final | 5/23/2002 | 5/24/2002 | 5/24/2002 12:00:00 AM | A | NR |
|
|
SIDE DOOR FOR ACCESS ###-####
|
BLD01-02964
| BLD-Final | 5/23/2002 | 5/24/2002 | 5/24/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 05/23/2002 at 12:37:19. Contact: ###-####.
|
BLD01-02338
| BLD-Final | 5/23/2002 | 5/24/2002 | 5/24/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 05/23/2002 at 14:36:31. Contact: ###-####. temp occ ok perm occ ok after plz perm sing off or posted bond 5/24/2002 11:38:36 AM
|
BLD01-02346
| BLD-Final | 5/23/2002 | 5/24/2002 | 5/24/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 05/23/2002 at 14:37:33. Contact: ###-####.temp occ ok perm occ ok after plz sighs off or bond is posted 5/24/2002 11:39:38 AM
|
BLD02-00125
| BLD-Final | 5/24/2002 | 5/24/2002 | 5/24/2002 12:00:00 AM | P | PASS |
|
|
###-#### rod c.c #23097 issued 5/24/2002 1:03:18 PM
|
MEC02-01415
| Rough-in | 5/24/2002 | 5/24/2002 | 5/24/2002 12:00:00 AM | P | PASS |
|
|
PAUL ###-#### OR STEVE ###-####
|
MEC02-01388
| Rough-in | 5/24/2002 | 5/24/2002 | 5/24/2002 12:00:00 AM | P | FAIL |
|
|
###-####
|
MEC02-01385
| Pressure Test | 5/24/2002 | 5/24/2002 | 5/24/2002 12:00:00 AM | P | PASS |
|
|
###-####
|
MEC02-01385
| Rough-in | 5/24/2002 | 5/24/2002 | 5/24/2002 12:00:00 AM | P | FAIL |
|
|
###-####
|
MEC02-01387
| Pressure Test | 5/24/2002 | 5/24/2002 | 5/24/2002 12:00:00 AM | P | PASS |
|
|
###-####
|
MEC02-01387
| Rough-in | 5/24/2002 | 5/24/2002 | 5/24/2002 12:00:00 AM | P | FAIL |
|
|
###-####
|
MEC02-01386
| Rough-in | 5/24/2002 | 5/24/2002 | 5/24/2002 12:00:00 AM | P | FAIL |
|
|
###-####
|
MEC02-01386
| Pressure Test | 5/24/2002 | 5/24/2002 | 5/24/2002 12:00:00 AM | P | PASS |
|
|
###-####
|
MEC02-01415
| Final | 5/24/2002 | 5/24/2002 | 5/24/2002 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 425 On 5/24/2002 1:37:21 PM
|
BLD02-00261
| BLD-Framing/Rough-in | 5/24/2002 | 5/24/2002 | 5/24/2002 12:00:00 AM | P | PART |
|
|
Added by Inspector: 425 On 5/24/2002 2:09:07 PM shear ok to cover ext
|
BLD02-00262
| BLD-Framing/Rough-in | 5/24/2002 | 5/24/2002 | 5/24/2002 12:00:00 AM | P | PART |
|
|
Added by Inspector: 425 On 5/24/2002 2:10:53 PM shear ok to cover ext
|
BLD02-00264
| BLD-Framing/Rough-in | 5/24/2002 | 5/24/2002 | 5/24/2002 12:00:00 AM | P | PART |
|
|
Added by Inspector: 425 On 5/24/2002 2:13:06 PM shear ok to cover ext
|
BLD02-00265
| BLD-Framing/Rough-in | 5/24/2002 | 5/24/2002 | 5/24/2002 12:00:00 AM | P | PART |
|
|
Added by Inspector: 425 On 5/24/2002 2:14:40 PM shear ok to cover ext
|