ESC04-00599
| Site Preparation | 5/21/2004 | 5/24/2004 | 5/24/2004 12:00:00 AM | A | PASS |
|
|
|
ESC04-00450
| Site Preparation | 5/24/2004 | 5/24/2004 | 5/24/2004 12:00:00 AM | P | PART |
|
|
RP--Post stormwater sign 5/24/2004 12:49:45 PM
|
ESC04-00451
| Site Preparation | 5/24/2004 | 5/24/2004 | 5/24/2004 12:00:00 AM | P | PART |
|
|
RP-Post stormwater sign 5/24/2004 12:50:03 PM
|
ESC04-00453
| Site Preparation | 5/24/2004 | 5/24/2004 | 5/24/2004 12:00:00 AM | P | PART |
|
|
RP-Post stormwater sign 5/24/2004 12:50:17 PM
|
ESC04-00449
| Site Preparation | 5/24/2004 | 5/24/2004 | 5/24/2004 12:00:00 AM | P | PART |
|
|
RP-Post stormwater sign 5/24/2004 12:50:32 PM
|
ESC04-00571
| Site Preparation | 5/24/2004 | 5/24/2004 | 5/24/2004 12:00:00 AM | P | PART |
|
|
Correction to contractor--Need to get RP per boise city on permit by the end of the day of 5/25/04 or a stop work order can be issued. 5/24/2004 1:10:16 PM
|
ESC04-00133
| Conference | 5/24/2004 | 5/24/2004 | 5/24/2004 12:00:00 AM | P | PASS |
|
|
site visit 5/24/2004 1:24:12 PM
|
ESC03-00034
| Site Preparation | 5/24/2004 | 5/24/2004 | 5/24/2004 12:00:00 AM | P | CANC |
|
|
|
ESC04-00034
| Site Preparation | 5/24/2004 | 5/24/2004 | 5/24/2004 12:00:00 AM | P | PART |
|
|
Everything ok except downhill side of pool is in need of sediment barrier, contacted rp. 5/24/2004 1:54:20 PM
|
ESC04-00039
| BMP Violation | 5/24/2004 | 5/24/2004 | 5/24/2004 12:00:00 AM | P | PART |
|
|
Most bmp's ok, Correction to RP including the need to re-install a section of the sediment barrier, sediment barrier needed on the curb/driveway at the end of the day to prevent internal sediment from leaving job site. 5/24/2004 2:29:56 PM
|