FIR05-00795
| INSP-Supply line flush | 5/24/2006 | 5/24/2006 | 5/24/2006 4:38:35 PM | P | PASS |
|
|
Underground flush passed.
|
FIR05-00788
| INSP-Supply line flush | 5/24/2006 | 5/24/2006 | 5/24/2006 4:38:14 PM | P | PASS |
|
|
Underground flush passed.
|
FIR05-00795
| INSP-Sprinkler Rough-in/Hydro | 5/24/2006 | 5/24/2006 | 5/24/2006 4:37:44 PM | P | PASS |
|
|
Underground supply hydro test passed.
|
FIR05-00788
| INSP-Sprinkler Rough-in/Hydro | 5/24/2006 | 5/24/2006 | 5/24/2006 3:09:59 PM | P | PASS |
|
|
Underground supply hydro test passed.
|
BLD06-00600
| FIRE-Final Inspection | 5/24/2006 | 5/24/2006 | 5/24/2006 2:00:08 PM | P | PART |
|
|
I gave a temporary occupancy until I can find out from Sam or Mary if fire alarm modifications are required
|
BLD06-00142
| FIRE-Final Inspection | 5/24/2006 | 5/24/2006 | 5/24/2006 1:55:16 PM | P | PASS |
|
|
Life safety finaled
|
BLD06-00250
| FIRE-Final Inspection | 5/23/2006 | 5/24/2006 | 5/24/2006 12:39:12 PM | A | FAIL |
|
|
Life safety is ok to final when the fire alarm permit is finaled.
|
BLD05-01694
| FIRE-Final Inspection | 5/23/2006 | 5/24/2006 | 5/24/2006 12:38:17 PM | A | FAIL |
|
|
The insulation has not been fixed yet and there are two sheets of plywood in the rear of the store that are over 4' wide that need sprinkler coverage under.
|
FIR06-00166
| INSP-Final Inspection | 5/23/2006 | 5/24/2006 | 5/24/2006 10:18:39 AM | A | FAIL |
|
|
Provide correct sample tube for the duct detector and change descruption of duct detector location.
|
FIR06-00196
| INSP-Final Inspection | 5/23/2006 | 5/24/2006 | 5/24/2006 10:15:57 AM | A | FAIL |
|
|
Can't final until the ceiling tile is installed. Sprinkler piping is ok to cover.
|
FIR05-00856
| INSP-Final Inspection | 5/23/2006 | 5/24/2006 | 5/24/2006 8:11:37 AM | A | PASS |
|
|
Permit finaled
|