Inspections for the day of: Wednesday, May 24, 2006.
Number of inspections: 22
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD02-01749 BLD-Aging Inspection5/24/20065/24/20065/24/2006 5:52:55 PM CANC
BLD05-03317 BLD-Framing/Rough-in5/23/20065/24/20065/24/2006 5:39:11 PMPNR
Internet Inspection Request from: Carey Allen. No approved plans or truss engineering.
BLD05-01775 BLD-Energy code compliance5/22/20065/24/20065/24/2006 5:32:08 PMPPASS
RANDY; Phone #: ###-#### NOTE: PLEASE CALL 1/2 HR PRIOR Internet Inspection Request from: Cathy Chiles
BLD05-01775 BLD-Framing/Rough-in5/22/20065/24/20065/24/2006 5:31:51 PMPFAIL
RANDY; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD05-02301 BLD-Framing/Rough-in5/24/20065/24/20065/24/2006 5:15:50 PMPFAIL
Phone #: ###-#### Internet Inspection Request from: Ed Thompson. repair holes and complete nailing on hangars.
BLD05-02285 BLD-Framing/Rough-in5/24/20065/24/20065/24/2006 5:15:00 PMPFAIL
Phone #: ###-#### Internet Inspection Request from: Ed Thompson. Remove non rated boxes. Strap floor joist. Fireblockall hvac penetrations, firecaulk seems and repair holes. provide correct truss engineering. ok to insul. c/n posted.
BLD05-02303 BLD-Framing/Rough-in5/24/20065/24/20065/24/2006 5:10:32 PMPPASS
Phone #: ###-#### Internet Inspection Request from: Ed Thompson
BLD06-01291 BLD-Footing5/24/20065/24/20065/24/2006 4:16:31 PMPPASS
Scheduled by a contractor via Hello! on 5/24/2006 at 10:14:58 AM. Contact: ###-####.
BLD06-01479 BLD-Framing/Rough-in5/24/20065/24/20065/24/2006 4:08:27 PMPPART
tom ###-#### or ###-####. pending elec.
BLD06-00634 BLD-Other5/24/20065/24/20065/24/2006 3:29:27 PMPFAIL
Kathy, ceiling grid, late afternoon; Phone #: ###-#### or ###-#### Internet Inspection Request from: Cathy Weisshaupt. Needs to install fixed system as is the remainder of bldg and per plans. Contractor has a fixed and floating system mixed.
BLD06-00889 BLD-Framing/Rough-in5/24/20065/24/20065/24/2006 3:04:19 PMPPASS
Scheduled by a contractor via Hello! on 5/24/2006 at 7:41:31 AM. Contact: ###-####. interior stud walls.
BLD05-02489 BLD-Other5/24/20065/24/20065/24/2006 2:41:17 PMPFAIL
jack Note: t-bar; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Ceiling grid not per plan. Need letter from arch. or change grid so it is per plan.
BLD04-03025 BLD-Framing/Rough-in5/24/20065/24/20065/24/2006 2:22:57 PMPPASS
All items on 3rd floor north wing have been resolved. ok to insulate walls.
BLD05-02722 BLD-Aging Inspection5/24/20065/24/20065/24/2006 10:10:40 AM PASS
Called Marty,hould have final by this friday.
BLD05-02414 BLD-Aging Inspection5/24/20065/24/20065/24/2006 10:07:54 AM PASS
work is in progress.
BLD05-01070 BLD-Final5/22/20065/24/20065/24/2006 10:05:38 AMANR
TOM; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. needs mech. final.
BLD05-02223 BLD-Framing/Rough-in5/24/20065/24/20065/24/2006 9:54:46 AMPCANC
Phone #: ###-#### Internet Inspection Request from: Ed Thompson Inspection cancelled from web by: Ed Thompson
BLD06-00632 BLD-Footing5/23/20065/24/20065/24/2006 9:54:43 AMAPART
dwayne Note: pouring at 3:00; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. wip. Bottom of footings were compacted vand tested. requested scope of work letter from special insp.
BLD06-01172 BLD-Framing/Rough-in5/23/20065/24/20065/24/2006 9:39:21 AMAPART
Scheduled by a contractor via Hello! on 5/23/2006 at 1:28:20 PM. Contact: ###-####. Framing ok, needs to get elec. permit and insp. prior to proceeding. c/n posted.
BLD05-02597 BLD-Framing/Rough-in5/23/20065/24/20065/24/2006 9:07:01 AMAPASS
brian; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
BLD06-00634 BLD-Final5/24/20065/24/20065/24/2006 8:53:30 AMPCANC
Scheduled by a contractor via Hello! on 5/24/2006 at 8:44:54 AM. Contact: ###-####. Inspection cancelled from web by: Cathy Weisshaupt
BLD04-03025 BLD-Framing/Rough-in5/23/20065/24/20065/24/2006 8:23:46 AMACANC
Scheduled by a contractor via Hello! on 5/23/2006 at 4:38:41 PM. Contact: ###-####.