FIR05-00021
| FIR-Aging Inspection | 5/24/2010 | 5/24/2010 | 5/25/2010 4:05:14 PM | | NR |
|
|
I spoke to James with Taylor Brothers about the status of this permit. He stated he would follow up. A follow up inspection has been set up for 6/3/20010
|
FIR10-00060
| INSP-Alarm Testing | 5/24/2010 | 5/24/2010 | 5/24/2010 3:50:31 PM | P | DONE |
|
|
Some of the phase I items were tested today. They included verification of the FACP model, telephone line numbers and troubles, facp battery trouble and interconnection with the NAC in the phase I basement. Spacing and operation of the phase I a/v's were also tested. A weather proof back box is needed at the cart ramp, add a strobe in the dressing room, provide a 135cd strobe in the outside dining area and provide the corrected sample tubes for the duct smoke detectors. The a/v's will need to be retested and EOL verified, test the duct smoke detectors for hvac shutdown, test the new smoke detectors and pull station.
|
FIR10-00155
| INSP-Sprinkler Rough-in | 5/24/2010 | 5/24/2010 | 5/24/2010 3:45:34 PM | P | PART |
|
|
There are two locations where there are two sprinkler pendants piped from the same 1" outlet which is not allowed. One pendant was missed being plunged and another exceeds 9' off of the single wall allowed. Also there are four rooms where wood framing/beams have been installed above the ceilings which can be covered with dry wall or replaced with fire treated wood. I discussed this with Don and Matt. Ceiling tile can be installed everywhere except these four rooms.
|
FIR05-00727
| INSP-Conference | 5/20/2010 | 5/24/2010 | 5/24/2010 12:35:52 PM | A | DONE |
|
|
I spoke to Joan with AIE ###-#### and she was going to follow up with the installing contractor.
|
BLD10-00889
| FIRE-Final Inspection | 5/21/2010 | 5/24/2010 | 5/24/2010 11:09:36 AM | A | PASS |
|
|
Life safety passed. The owner is setting up the annual inspection for the fire sprinkler system.
|