Inspections for the day of: Monday, May 24, 2010.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC05-00845 Aging Inspection5/24/20105/24/20105/25/2010 2:32:19 PM DONE
ESC10-00407 Site Preparation5/24/20105/24/20105/24/2010 4:06:30 PM NR
ESC05-00898 Aging Inspection5/24/20105/24/20105/24/2010 3:50:21 PM DONE
ESC05-00898 DOC - Permit Finaled5/24/20105/24/20105/24/2010 3:50:11 PMPPASS
ESC05-00894 Aging Inspection5/24/20105/24/20105/24/2010 3:50:02 PM DONE
ESC05-00894 DOC - Permit Finaled5/24/20105/24/20105/24/2010 3:49:48 PMPPASS
ESC05-01967 Aging Inspection5/24/20105/24/20105/24/2010 3:43:39 PM DONE
Project not completed yet.
ESC08-00776 General Inspection5/24/20105/24/20105/24/2010 3:42:39 PM DONE
ESC10-00008 Site Preparation5/14/20105/24/20105/24/2010 3:41:57 PMPPASS
ESC05-00897 Aging Inspection5/24/20105/24/20105/24/2010 10:00:34 AM DONE
ESC05-00897 DOC - Permit Finaled5/24/20105/24/20105/24/2010 10:00:26 AMPPASS
ESC07-00359 Aging Inspection5/24/20105/24/20105/24/2010 9:59:39 AM DONE
still active.
ESC10-00052 Tracking Control5/24/20105/24/20105/24/2010 9:57:38 AMAFAIL
Verbal to RP:
If the company chooses to work in the saturated conditions, need to stay up on tracking issues and clean up the exsisting tracking off of the hardsurfaces.
ESC10-00063 Tracking Control5/24/20105/24/20105/24/2010 9:48:35 AMAFAIL
Spoke with excavator to set up the construction access prior to trucks pulling up into the lot due to the saturated soil. Will have it completed this morning and all sediment cleaned up off of the hard surfaces also.
ESC10-00401 Site Preparation5/24/20105/24/20105/24/2010 9:44:38 AMAPASS
ESC10-00272 Site Preparation5/21/20105/24/20105/23/2010 10:28:37 PMAPASS
MIS10-00142 ESC-Conference5/21/20105/24/20105/23/2010 10:28:04 PMADONE
Spoke with PC Maint. over the requirements wwith the reeasing of the the ESC permit prior to the grading permit. Allowing them to reove spoils piles within the parking lot for business services. No paving will occur until grading permit has been issued.