MIS13-00147
| BLD-Conference | 5/23/2013 | 5/24/2013 | 5/24/2013 4:55:03 PM | P | DONE |
|
|
Check back. Contractor got a permit for roofing.
|
MIS13-00147
| DOC - Permit Finaled | 5/24/2013 | 5/24/2013 | 5/24/2013 4:54:08 PM | P | PASS |
|
|
|
BLD13-01219
| BLD-Conference | 5/24/2013 | 5/24/2013 | 5/24/2013 4:53:38 PM | P | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by Chris Howell
|
BLD13-01219
| DOC - Permit Finaled | 5/24/2013 | 5/24/2013 | 5/24/2013 4:53:14 PM | P | PASS |
|
|
|
BLD13-01254
| BLD-Final | 5/24/2013 | 5/24/2013 | 5/24/2013 4:51:40 PM | P | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by WALTER HOLLAND
|
BLD13-01254
| DOC - Permit Finaled | 5/24/2013 | 5/24/2013 | 5/24/2013 4:51:11 PM | P | PASS |
|
|
|
BLD13-00472
| BLD-Energy code compliance | 5/23/2013 | 5/24/2013 | 5/24/2013 2:22:27 PM | A | PASS |
|
|
Zach Phone #: ###-####
|
GCB13-00011
| GCB-Final | 5/23/2013 | 5/24/2013 | 5/24/2013 12:04:23 PM | A | NR |
|
|
Please call first Phone #: ###-#### Walk Thru..........
|
GCB13-00019
| GCB-Final | 5/23/2013 | 5/24/2013 | 5/24/2013 12:02:07 PM | A | PASS |
|
|
Derrick Phone #: ###-####
|
GCB13-00017
| GCB-Final | 5/23/2013 | 5/24/2013 | 5/24/2013 10:53:12 AM | A | PASS |
|
|
Airblower test posted on furnace Phone #: ###-#### Unable to determine if all other permits have been finaled. Structural final Only.....OK.
|
GCB13-00016
| GCB-Final | 5/23/2013 | 5/24/2013 | 5/24/2013 10:33:34 AM | A | PASS |
|
|
Airblower test posted on furnace Phone #: ###-#### Unable to determine if all other permits have been finaled. Structural final.....OK
|