Inspections for the day of: Tuesday, May 24, 2016.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC15-01265 General Inspection5/24/20165/24/20165/25/2016 11:29:05 AM PASS
No disturbed area or building materials remaining on site. BLD finaled with TO. ESC permit conditons satisfied.
ESC15-01377 Aging Inspection5/24/20165/24/20165/24/2016 12:03:57 PM PASS
work complete. BLD finaled. Addition in vegetated backyard, no sediment leaving site.
ESC15-01377 DOC - Permit Finaled5/24/20165/24/20165/24/2016 12:03:30 PMPPASS
ESC15-01371 Aging Inspection5/24/20165/24/20165/24/2016 12:03:04 PM PASS
No ESC issues, all permits finaled.
ESC15-01371 DOC - Permit Finaled5/24/20165/24/20165/24/2016 12:02:50 PMPPASS
ESC15-01256 General Inspection5/24/20165/24/20165/24/2016 12:02:34 PM CANC
rescheduled for site final 5/26
ESC15-01261 General Inspection5/24/20165/24/20165/24/2016 12:01:57 PM PASS
BLD finaled with temp occupancy. Restaurant bar in operation. No disturbed area remaing at site, no temp BMPs to remove. Permit conditions satisfied.
ESC15-01261 DOC - Permit Finaled5/24/20165/24/20165/24/2016 12:01:46 PMPPASS
ESC16-00547 Site Preparation5/23/20165/24/20165/24/2016 9:44:52 AMAPASS
Vince Phone #: ###-####

Approved for construction. RP familiar with ESC conditions and BMPs.
ESC16-00405 Site Preparation5/23/20165/24/20165/24/2016 8:51:14 AMAPASS
Michelle Phone #: ###-####

RP reviewed dust control and track out prevention /clean up with crew this morning. Permit sign posted near job trailer. SWPPP map updated with location of stockpile. Storm drains have inlet protection.

Approved for construction, starting today.

Note: onsite foreman is Vicente