ELE13-02693
| ELE-Aging Inspection | 5/24/2017 | 5/24/2017 | 5/30/2017 10:37:53 AM | | PASS |
|
|
Ok final. New mast and guy kit
|
ELE17-01577
| Conference | 5/23/2017 | 5/24/2017 | 5/24/2017 1:41:01 PM | A | DONE |
|
|
I need an hour or more of notice to meet so I can have time to drive to job site. please call and we can set a time to meet. thank you Phone #: ###-#### Inspection requested via web by Justin Frates Discussed new service to re-feed existing home.
|
ELE17-00683
| Final | 5/24/2017 | 5/24/2017 | 5/24/2017 12:24:43 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by steve ragan Ok final. Corrections made.
|
ELE17-00871
| Final | 5/24/2017 | 5/24/2017 | 5/24/2017 11:52:02 AM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Kendra Lanham Ok final kitchen
|
ELE17-01231
| Permanent Service | 5/23/2017 | 5/24/2017 | 5/24/2017 10:47:39 AM | A | CANC |
|
|
Available 11am - 12pm, after Idaho Power removes overhead service. Thanks, Mark. - Kurt Phone #: ###-#### Inspection requested via web by Kurt Fesenmyer I added a rough and final inspection for this permit. It was not supposed to be an energize service.
|
ELE17-01231
| Final | 5/24/2017 | 5/24/2017 | 5/24/2017 10:46:51 AM | P | PASS |
|
|
Final to close out homeowners permit for ground works.
|
ELE17-01231
| Electrical Rough-In | 5/24/2017 | 5/24/2017 | 5/24/2017 10:46:07 AM | P | PASS |
|
|
This is for a cover on ground works from house to detached garage. Not permanent service. Ok cover
|
ELE17-01169
| Permanent Service | 5/23/2017 | 5/24/2017 | 5/24/2017 10:42:03 AM | A | PASS |
|
|
Available 11am - 12pm, after Idaho Power removes overhead service (@9am Wednesday). Thanks, Mark. - Kurt Phone #: ###-#### Inspection requested via web by Kurt Fesenmyer p/s u/g n ok. Service was changed from overhead to underground.
|
ELE16-02623
| Electrical Rough-In | 5/23/2017 | 5/24/2017 | 5/24/2017 10:06:05 AM | A | PASS |
|
|
Pod #4 drop bathroom ceilings Call Craig Phone #: ###-#### Inspection requested via web by Tom Betty Ok cover 2nd and 3rd floor bath lids and ERU's POD #4
|
ELE17-01475
| Electrical Rough-In | 5/23/2017 | 5/24/2017 | 5/24/2017 9:08:08 AM | A | PASS |
|
|
Inspect (2ea) disconnects for car lights in the mechanical room . Contact Ben Duke for access ###-#### Phone #: ###-#### Inspection requested via web by steve ragan Installation of 2 lights in mech rm, and 2 lights in elevator pit. Fixtures have protective cages around them
|
ELE17-01475
| Final | 5/24/2017 | 5/24/2017 | 5/24/2017 9:07:09 AM | P | PASS |
|
|
Ok final 2 lights in mech rm, and 2 lights in elevator pit
|
ELE17-01583
| Final | 5/24/2017 | 5/24/2017 | 5/24/2017 9:05:55 AM | A | PASS |
|
|
fixture is in shop Phone #: ###-#### Inspection requested via web by Chris Berthelot Talked to contractor, they replaced 1 flour with new tandom
|
ELE17-01569
| Electrical Rough-In | 5/23/2017 | 5/24/2017 | 5/24/2017 8:45:33 AM | A | PASS |
|
|
Rough in for wall cover is ready the ceiling will be open and some grid thanks Brad Please call with any questions Phone #: ###-#### Inspection requested via web by Brad Baker Ok cover walls, bath lid and small soffit on E wall
|
ELE16-04108
| Electrical Rough-In | 5/24/2017 | 5/24/2017 | 5/24/2017 8:18:35 AM | A | PASS |
|
|
Ceiling Inspection in the Gatehouse. Contact Dan Hutchinson ###-#### Thank you Phone #: ###-#### Inspection requested via web by Cathy Duchek Ok cover ceiling in food prep area
|