PLM18-02150
| Final | 5/24/2018 | 5/24/2018 | 5/24/2018 4:56:31 PM | P | PASS |
|
|
PM / Craig ###-#### Phone #: ###-#### Inspection requested via web by Krista Boss
|
PLM18-02168
| Water Heater Final | 5/24/2018 | 5/24/2018 | 5/24/2018 4:30:58 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Chris Field. Flue test ok and heater install ok
|
PLM18-01929
| Water and/or Sewer | 5/23/2018 | 5/24/2018 | 5/24/2018 4:13:12 PM | P | NR |
|
|
Josh Phone #: ###-####.
|
PLM18-02123
| Final | 5/22/2018 | 5/24/2018 | 5/24/2018 4:12:15 PM | P | PASS |
|
|
INSTALLER BRIAN ###-#### Phone #: ###-#### Inspection requested via web by Aaron Alandt
|
PLM18-00419
| Sprinkler (Final) | 5/24/2018 | 5/24/2018 | 5/24/2018 4:04:32 PM | P | FAIL |
|
|
Add a union within 12" of the backflow assemby. Have the RP cerified.
|
PLM17-04592
| Final | 5/24/2018 | 5/24/2018 | 5/24/2018 4:02:42 PM | P | PASS |
|
|
MARK IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER
|
PLM17-03786
| Water and/or Sewer | 5/24/2018 | 5/24/2018 | 5/24/2018 4:01:51 PM | P | PASS |
|
|
|
PLM18-01702
| Plumbing Rough-in | 5/24/2018 | 5/24/2018 | 5/24/2018 3:41:07 PM | P | PART |
|
|
HENRY IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER. Mark with Buss is going to have the engineer review the scheduled pumps. The dishcharge is too high for the pipe size available. OK to cover the walls.
|
PLM17-04751
| Plumbing Rough-in | 5/23/2018 | 5/24/2018 | 5/24/2018 2:33:02 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen
|
PLM17-04752
| Plumbing Rough-in | 5/23/2018 | 5/24/2018 | 5/24/2018 2:32:47 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen
|
PLM06-03931
| Final | 5/24/2018 | 5/24/2018 | 5/24/2018 2:03:41 PM | A | PASS |
|
|
final inspection to close out previously expired permits
|
PLM06-02975
| Final | 5/24/2018 | 5/24/2018 | 5/24/2018 2:02:56 PM | P | PASS |
|
|
Please call ahead for access - To close out previously completed work with re-opened permit - Kathy Phone #: ###-####
|
PLM18-02000
| Final | 5/23/2018 | 5/24/2018 | 5/24/2018 11:34:18 AM | A | PASS |
|
|
Later AM. Please call the customer when on way: Murray ###-#### Phone #: ###-#### Inspection requested via web by Krista Boss
|
PLM18-02155
| Plumbing Rough-in | 5/23/2018 | 5/24/2018 | 5/24/2018 11:12:37 AM | A | PASS |
|
|
ROUGH IN AND TRIM FOR SINGLE SINK ROUGH IN INSPECTION SCHEDULED NOW WORK WILL BE COMPLETED IN A WEEK FINAL INSPECTION TO FOLLOW (PLEASE CONTACT BRAD WITH ANY QUESTIONS OR CONCERNS) Phone #: ###-#### Inspection requested via web by Ben Davis. Visual inspection of work done without a permit by privios tenant. All is up to code
|
PLM18-00599
| Plumbing Rough-in | 5/23/2018 | 5/24/2018 | 5/24/2018 10:56:27 AM | A | PART |
|
|
MATT IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER Six sets of roof drains on the north end of the building.
|
PLM18-00836
| Final | 5/23/2018 | 5/24/2018 | 5/24/2018 10:39:28 AM | A | PASS |
|
|
3162 ENTER Phone #: ###-#### Inspection requested via web by Ann Marie Reyes
|
PLM18-02061
| Plumbing Rough-in | 5/23/2018 | 5/24/2018 | 5/24/2018 10:21:20 AM | A | PASS |
|
|
CHRIS IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER
|
MIS18-00193
| PLM-Conference | 5/23/2018 | 5/24/2018 | 5/24/2018 9:46:18 AM | A | PART |
|
|
call Kandyce when on way out ###-#### // Substandard renters complaint: fuses in kitchen keep blowing, circuits possibly overloaded, bathroom tub and sink drain slow, smoke alarms not working, general life safety issues Plumbing is passed no code issues. The complaints for plumbing are maintanance.
|
PLM18-00782
| Final | 5/24/2018 | 5/24/2018 | 5/24/2018 8:28:43 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by MICHAEL BYERS
|
PLM18-01415
| Final | 5/24/2018 | 5/24/2018 | 5/24/2018 8:27:58 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Nels Moore
|