FIR18-00129
| INSP-Sprinkler Rough-in | 5/23/2018 | 5/24/2018 | 5/24/2018 11:22:10 AM | P | PASS |
|
|
The previous corrections have been made. Piping can be covered. There are no fire review comments on site. I will need these prior to a final sign off and all conditions, if any, will need to be met.
ontact Andrew Larson ###-#### 30 min prior to RTC Insp Start please
Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
|
FIR17-00507
| INSP-Sprinkler Rough-in | 5/24/2018 | 5/24/2018 | 5/24/2018 11:17:25 AM | P | PASS |
|
|
Underground supply piping is ok for cover.
Stan is the contact for this underground rough-in. Thank you. Phone #: ###-#### Inspection requested via web by Stan Beus
|
BLD18-01239
| FIRE-Final Inspection | 5/23/2018 | 5/24/2018 | 5/24/2018 10:28:30 AM | A | PASS |
|
|
Life safety passed
Suman Phone #: ###-####
|
BLD17-00374
| FIRE-Final Inspection | 5/23/2018 | 5/24/2018 | 5/24/2018 10:19:32 AM | A | FAIL |
|
|
Repair main entrance exit discharge light, Provide panic hardware on door 111A, Provide listed smoke detectors, both sides, for release of door. See NFPA 72 17.7.5.6 for door 113A, Provide installation and testing of roll down fire door per NFPA 80, Provide exit sign/emergency llight and single action hardware at door 116A, Provide revised floor plans showing revised wall layout at doors 113A and 116A, Provide emergency lighting at interior west stairs as shown on the plans, Remove dead bolts from doors 119A, 119B and 115B, Provide racking permit for storage racks exceeding 8'-0" in height, Provide list of type/quantity of hazardous chemicals such as oil storage (new & waste), parts solvents, batteries...ect.
please call Dutch @###-#### 1 hr before arrival, Thank you Phone #: ###-#### Inspection requested via web by Dennis Harmon
|