PLM00-00618
| Plumbing Rough-in | 5/24/2000 | 5/25/2000 | 5/25/2000 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 05/24/2000 at 13:25:30. Contact: ###-####. east 2/3rds, and interceptor test ok 5/25/00 9:35:24 AM
|
PLM00-01749
| Sprinkler (Final) | 5/24/2000 | 5/25/2000 | 5/25/2000 12:00:00 AM | A | FAIL |
|
|
paul ###-#### sprinkler final need gate code 5/25/00 9:57:37 AM
|
PLM00-00013
| Final | 5/24/2000 | 5/25/2000 | 5/25/2000 12:00:00 AM | A | PASS |
|
|
John ###-#### house right next door the stone house and they will open it for you final o with t&p drain turned down 5/25/00 9:34:51 AM
|
PLM00-01752
| Plumbing Rough-in | 5/24/2000 | 5/25/2000 | 5/25/2000 12:00:00 AM | A | PASS |
|
|
Jan ###-#### ri ok w/ nps installed 5/25/00 12:04:27 PM
|
PLM99-03827
| Plumbing Rough-in | 5/24/2000 | 5/25/2000 | 5/25/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 05/24/2000 at 16:21:37. Contact: ###-####.
|
PLM00-00661
| Final | 5/24/2000 | 5/25/2000 | 5/25/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 05/24/2000 at 16:22:15. Contact: ###-####.
|
PLM00-01761
| Plumbing Rough-in | 5/25/2000 | 5/25/2000 | 5/25/2000 12:00:00 AM | P | FAIL |
|
|
Carla ###-#### no tests 5/25/00 1:57:10 PM
|
PLM00-01749
| Sprinkler (Final) | 5/25/2000 | 5/25/2000 | 5/25/2000 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 330 On 5/25/00
|