BLD00-00186
| FIRE-Final Inspection | 5/24/2000 | 5/25/2000 | 5/25/2000 12:00:00 AM | A | FAIL |
|
|
Brad ###-#### Duct detectors for AHU; door hardware 5/25/00 1:41:23 PM
|
BLD99-03673
| FIRE-Supply Line Flush | 5/24/2000 | 5/25/2000 | 5/25/2000 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 05/24/2000 at 13:20:04. Contact: ###-####. Need permit underground; not coated per NFPA 2Y 5/25/00 1:41:44 PM
|
FIR00-00275
| INSP-Sprinkler Rough-in | 5/24/2000 | 5/25/2000 | 5/25/2000 12:00:00 AM | A | FAIL |
|
|
underground Nat ###-#### Need thermal protection for underground main due to depth of bury at 2.5 ft. 5/25/00 1:42:09 PM
|
FIR99-00607
| INSP-Sprinkler Rough-in/Hydro | 5/25/2000 | 5/25/2000 | 5/25/2000 12:00:00 AM | P | PASS |
|
|
Ann ###-#### Ok to cover 5/26/00 1:30:43 PM
|
BLD98-02492
| FIRE-Final Inspection | 5/25/2000 | 5/25/2000 | 5/25/2000 12:00:00 AM | P | PASS |
|
|
|
BLD99-03400
| FIRE-Final Inspection | 5/25/2000 | 5/25/2000 | 5/25/2000 12:00:00 AM | P | FAIL |
|
|
panic on A3 room doors; alarm issues; c/n issued
|
FIR99-00668
| INSP-Final Inspection | 5/25/2000 | 5/25/2000 | 5/25/2000 12:00:00 AM | P | PASS |
|
|
|
FIR00-00076
| INSP-Final Inspection | 5/25/2000 | 5/25/2000 | 5/25/2000 12:00:00 AM | P | PASS |
|
|
|
FIR00-00009
| INSP-Conference | 5/25/2000 | 5/25/2000 | 5/25/2000 12:00:00 AM | P | PART |
|
|
met with Lynn about obstructed heads in main store; canopies over 4 ft require heads; sway bracing needed. c/n issued on 5/24 to general contractor about the above
|
FIR00-00318
| INSP-Sprinkler Rough-in | 5/25/2000 | 5/25/2000 | 5/25/2000 12:00:00 AM | P | FAIL |
|
|
supply line cover - not coated properly; fire sprinkler plan not permitted
|