BLD01-00111
| BLD-Aging Inspection | 5/25/2001 | 5/25/2001 | 5/25/2001 12:00:00 AM | | PART |
|
|
wip 5/25/2001 2:42:33 PM
|
BLD01-00158
| BLD-Aging Inspection | 5/25/2001 | 5/25/2001 | 5/25/2001 12:00:00 AM | | PASS |
|
|
sign, no call for insp... 5/25/2001 11:11:31 AM
|
BLD01-01150
| BLD-Conference | 5/25/2001 | 5/25/2001 | 5/25/2001 12:00:00 AM | A | PART |
|
|
Added by Inspector: 340 On 5/25/2001 9:27:35 AM shear ok
|
BLD00-02512
| BLD-Conference | 5/25/2001 | 5/25/2001 | 5/25/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 340 On 5/25/2001 10:58:14 AM w/ Mike Wilson...need all other sig's for final & completetion of project
|
BLD98-01409
| BLD-Final | 5/25/2001 | 5/25/2001 | 5/25/2001 12:00:00 AM | A | FAIL |
|
|
Added by Inspector: 340 On 5/25/2001 11:00:33 AM c/n, need eng's / spec. insp's affidavits...
|
BLD01-01322
| BLD-Footing | 5/24/2001 | 5/25/2001 | 5/25/2001 12:00:00 AM | A | NR |
|
|
Scheduled by a contractor via Hello! on 05/24/2001 at 17:37:16. Contact: ###-####....remove tree roots 5/25/2001 9:16:19 AM
|
BLD01-01322
| BLD-Conference | 5/24/2001 | 5/25/2001 | 5/25/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 05/24/2001 at 17:37:51. Contact: ###-####....w/ contractor, remove tree, fill, compact, recall 5/25/2001 9:17:37 AM
|
BLD00-00081
| BLD-Conference | 5/25/2001 | 5/25/2001 | 5/25/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 340 On 5/25/2001 7:47:48 AM w/ John Schultz re: modifications to upgrade, need eng's letter
|
BLD00-03519
| BLD-Concrete | 5/23/2001 | 5/25/2001 | 5/25/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 05/23/2001 at 13:04:13. Contact: (208) p.t. deck###-####...pending spec insp reports; eng'r made site visit 5/25/2001 11:41:46 AM
|
MEC01-00817
| Final | 5/23/2001 | 5/25/2001 | 5/25/2001 12:00:00 AM | A | PART |
|
|
###-####, only way this space can have a temp. final, is if exhaust from hood is ducted into space. when hood is on air should blow out three diff. in front of hood in ceiling. 5/23/2001 2:27:39 PM...exhaust is as stated; ok for t/o 5/25/2001 3:33:04 PM
|
BLD01-01150
| BLD-Framing/Rough-in | 5/24/2001 | 5/25/2001 | 5/25/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 05/24/2001 at 13:24:17. Contact: ###-####....seal plates, ok to cover. 5/25/2001 5:03:03 PM
|
BLD00-01631
| BLD-Final | 5/24/2001 | 5/25/2001 | 5/25/2001 12:00:00 AM | P | NR |
|
|
early afternoon Tim ###-#### this was the test you can cancl this insp. you talked to kim fri. 5/25/2001 2:26:28 PM...nr, recall 5/25/2001 2:46:10 PM
|
BLD01-00915
| BLD-Framing/Rough-in | 5/24/2001 | 5/25/2001 | 5/25/2001 12:00:00 AM | P | PART |
|
|
###-####, arch's clarification/detail at office??OK to continue 5/25/2001 1:35:42 PM
|
BLD00-03316
| BLD-Framing/Rough-in | 5/25/2001 | 5/25/2001 | 5/25/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 05/25/2001 at 08:14:03. Contact: ###-####....has stamped clarification and spec insp report for tube steel at masonry opening, ok; also revised drawings for storefront ,ok to complete addition of braces and inspect ab 5/25/2001 4:51:45 PM ve ceiling at final 5/25/2001 4:51:57 PM
|
BLD01-00140
| BLD-Final | 5/25/2001 | 5/25/2001 | 5/25/2001 12:00:00 AM | P | FAIL |
|
|
###-####; c/n, door hdwe,, racks,etc...ok for t/o 5/25/2001 4:48:21 PM
|
BLD00-01612
| BLD-Footing | 5/25/2001 | 5/25/2001 | 5/25/2001 12:00:00 AM | P | PART |
|
|
Scott ###-####; canopy ftgs...no spec. insp. req'd at 2500psi...appears ok 5/25/2001 3:23:14 PM
|
BLD00-03662
| BLD-Aging Inspection | 5/25/2001 | 5/25/2001 | 3/29/2000 12:00:00 AM | | PASS |
|
|
wip 5/30/2001 9:05:41 AM
|