Inspections for the day of: Thursday, May 25, 2006.
Number of inspections: 5
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD05-03448 FIRE-Conference5/22/20065/25/20065/26/2006 11:18:00 AMPPART
Inspection to verify completion of previous correction notice items, also tested access controlled atrium doors on floors 1-5 for functionality, tested emergency lighting and exit signage on backup power for the basement only, verified mag lock dropout upon fire alarm at access controlled doors, tested door release at basement elevator lobby. The project related fire sprinkler permit must be finaled prior to final approval for the basement code upgrade permit.
FIR06-00266 INSP-Final Inspection5/23/20065/25/20065/25/2006 12:02:17 PMAPASS
Fire alarm work passed field inspection, noted attatchment methods for fire alarm wire to the building structure.
FIR06-00264 INSP-Final Inspection5/23/20065/25/20065/25/2006 12:00:11 PMANR
Project is not ready for final field inspection as the tenant walls which separate the offices and rooms are not completed for verification of notification coverage and audibility.
FIR06-00192 INSP-Final Inspection5/23/20065/25/20065/25/2006 11:44:50 AMACANC
Per contractor the project will require resubmittals due to significant changes in wall layout.
FIR06-00128 INSP-Sprinkler Rough-in/Hydro5/24/20065/25/20065/25/2006 10:52:50 AMAFAIL
No inspection for cover at the drop ceiling areas performed as requested due to the "partial" approval status of the plans. Contractor to address items 1-3 on plan review notes prior to next field inspection.