BLD05-03448
| FIRE-Conference | 5/22/2006 | 5/25/2006 | 5/26/2006 11:18:00 AM | P | PART |
|
|
Inspection to verify completion of previous correction notice items, also tested access controlled atrium doors on floors 1-5 for functionality, tested emergency lighting and exit signage on backup power for the basement only, verified mag lock dropout upon fire alarm at access controlled doors, tested door release at basement elevator lobby. The project related fire sprinkler permit must be finaled prior to final approval for the basement code upgrade permit.
|
FIR06-00266
| INSP-Final Inspection | 5/23/2006 | 5/25/2006 | 5/25/2006 12:02:17 PM | A | PASS |
|
|
Fire alarm work passed field inspection, noted attatchment methods for fire alarm wire to the building structure.
|
FIR06-00264
| INSP-Final Inspection | 5/23/2006 | 5/25/2006 | 5/25/2006 12:00:11 PM | A | NR |
|
|
Project is not ready for final field inspection as the tenant walls which separate the offices and rooms are not completed for verification of notification coverage and audibility.
|
FIR06-00192
| INSP-Final Inspection | 5/23/2006 | 5/25/2006 | 5/25/2006 11:44:50 AM | A | CANC |
|
|
Per contractor the project will require resubmittals due to significant changes in wall layout.
|
FIR06-00128
| INSP-Sprinkler Rough-in/Hydro | 5/24/2006 | 5/25/2006 | 5/25/2006 10:52:50 AM | A | FAIL |
|
|
No inspection for cover at the drop ceiling areas performed as requested due to the "partial" approval status of the plans. Contractor to address items 1-3 on plan review notes prior to next field inspection.
|