Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC10-00404 Site Preparation5/25/20105/25/20105/26/2010 11:25:19 AM CANC
Tentative start date of 6/7/2010.
ESC05-00845 DOC - Permit Finaled5/25/20105/25/20105/25/2010 2:32:04 PMPPASS
ESC10-00406 Site Preparation5/25/20105/25/20105/25/2010 2:24:54 PM NR
ESC10-00402 Site Preparation ESC5/25/20105/25/20105/25/2010 1:50:37 PM DONE
Work completed.
ESC10-00402 DOC - Permit Finaled5/25/20105/25/20105/25/2010 1:50:21 PMPPASS
ESC10-00389 Site Preparation5/25/20105/25/20105/25/2010 1:35:24 PM NR
ESC10-00327 Conference5/21/20105/25/20105/25/2010 10:16:11 AMADONE
Went over the conditions that pertain with the permit that was issued. Also discussed with them over federal requirements and local requirements.
ESC10-00240 Conference5/21/20105/25/20105/25/2010 10:15:53 AMADONE
Went over the conditions that pertain with the permit that was issued. Also discussed with them over federal requirements and local requirements.
ESC10-00271 Conference5/21/20105/25/20105/25/2010 10:15:41 AMADONE
Went over the conditions that pertain with the permit that was issued. Also discussed with them over federal requirements and local requirements.
ESC10-00052 General Inspection5/21/20105/25/20105/25/2010 10:13:55 AMAFAIL
Verbal to the Contractor:
Clean up all sediment off of the hard surfaces coming from the Construction access that also need to be maintained. Will re-inspect on 5/26/am.
ESC10-00063 Tracking Control5/24/20105/25/20105/25/2010 10:12:04 AMAPASS