BLD12-00217
| FIRE-Conference | 5/25/2012 | 5/25/2012 | 5/25/2012 4:36:46 PM | P | DONE |
|
|
|
BLD11-00824
| FIRE-Final Inspection | 5/25/2012 | 5/25/2012 | 5/25/2012 4:36:09 PM | P | PART |
|
|
Project related fire alarm work to be finaled prior to fire life safety approvals.
|
BLD12-00952
| FIRE-Final Inspection | 5/25/2012 | 5/25/2012 | 5/25/2012 4:33:47 PM | P | NR |
|
|
|
BLD12-00930
| FIRE-Sprinkler Rough-in | 5/25/2012 | 5/25/2012 | 5/25/2012 4:31:32 PM | P | PART |
|
|
Fire sprinkler modifications at the NW corner office area okayed for ceiling cover.
|
BLD12-00955
| FIRE-Final Inspection | 5/24/2012 | 5/25/2012 | 5/25/2012 11:46:02 AM | A | PASS |
|
|
Fire life safety passed under condition interior doors at two locations are installed and verified for compliance at structural final inspection.
|
BLD11-02020
| FIRE-Sprinkler Rough-in | 5/25/2012 | 5/25/2012 | 5/25/2012 11:42:57 AM | A | PART |
|
|
Reference dated and initialed annotations on FP plans for current locations approved for cover.
|
FIR12-00236
| INSP-Final Inspection | 5/24/2012 | 5/25/2012 | 5/25/2012 11:41:18 AM | A | PASS |
|
|
Fire sprinkler permit work passed final walkthrough.
|