Inspections for the day of: Wednesday, May 25, 2016.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Storey
TitleBLD-COM/RES INSPECTOR
Phone #794-9490
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD16-01148 BLD-Final5/24/20165/25/20165/25/2016 4:14:06 PMAFAIL
David Phone #: ###-#### door sign
BLD16-01518 BLD-Final5/24/20165/25/20165/25/2016 4:12:49 PMPPASS
'
BLD14-01829 BLD-Wall cover5/23/20165/25/20165/25/2016 4:04:11 PMPNR
Bathroom behind cabinets all three floors Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD14-01831 BLD-Ceiling Grid Inspection5/24/20165/25/20165/25/2016 3:57:54 PMPFAIL
RC third floor Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD14-01831 BLD-Ceiling Grid Inspection5/24/20165/25/20165/25/2016 3:55:49 PMAPASS
First floor bathroom ceilings Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD16-01704 BLD-Final5/25/20165/25/20165/25/2016 2:53:19 PMPFAIL
Call for access // Creed Phone #: ###-#### perm. sign for door.
BLD15-00516 BLD-Conference5/25/20165/25/20165/25/2016 2:29:44 PMPPART
would like call ahead; Randy Phone #: ###-#### box spk pipe
BLD16-00179 BLD-Framing/Rough-in5/25/20165/25/20165/25/2016 2:00:21 PMPPASS
Odie Phone #: ###-#### north to center east side ok
BLD16-00307 BLD-Conference5/25/20165/25/20165/25/2016 10:50:28 AMAFAIL
Waterstop and Waterproofing inspections at S/17.8 and 17.8/B grid lines. Phone #: ###-#### Inspection requested via web by Dan Koski back filled with out inspection short of ele duct bank
BLD16-00682 BLD-Energy code compliance5/23/20165/25/20165/25/2016 10:06:00 AMAPASS
Reinspect for framing corrections and energy insulation. Thanks, steve Phone #: ###-#### Inspection requested via web by steve hanson
BLD15-04457 BLD-Aging Inspection5/25/20165/25/20165/25/2016 9:50:55 AM PASS
wip