PLM16-01902
| Water Heater Final | 5/25/2016 | 5/25/2016 | 5/25/2016 4:36:16 PM | A | CANC |
|
|
WATER HEATER INSTALL - HOMEOWNER REQUESTS INSPECTION AS CLOSE TO NOON AS POSSIBLE. PLEASE CALL 1 HOUR PRIOR TO ARRIVAL ###-####. HOMEOWNER IS MIKE WESTOVER Phone #: ###-#### Inspection requested via web by JEREMY LINK >I scheduled for the wrong morning. it is now scheduled for 5/26
|
PLM16-01849
| Final | 5/24/2016 | 5/25/2016 | 5/25/2016 3:57:42 PM | P | PASS |
|
|
Backfilled and backflow is certified. Call Kassy in office for questions ###-#### Phone #: ###-#### Inspection requested via web by Kassy Goodwin
|
PLM16-01890
| Plumbing Rough-in | 5/25/2016 | 5/25/2016 | 5/25/2016 3:55:16 PM | P | PASS |
|
|
Please contact Bill Kirk for site access. Bill Kirk ###-#### Phone #: ###-#### Inspection requested via web by Joshua Bennett
|
PLM16-01882
| Water and/or Sewer | 5/24/2016 | 5/25/2016 | 5/25/2016 3:43:09 PM | P | FAIL |
|
|
Contact Luis Ornelas @ ###-#### for any questions. Phone #: ###-#### Inspection requested via web by Accounts Payable >need drain down valve
|
PLM16-01658
| Plumbing Rough-in | 5/24/2016 | 5/25/2016 | 5/25/2016 3:06:35 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Ann Marie Reyes
|
PLM16-01898
| Sprinkler (Final) | 5/25/2016 | 5/25/2016 | 5/25/2016 2:29:12 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Darrell Roark
|
PLM16-01685
| Water and/or Sewer | 5/24/2016 | 5/25/2016 | 5/25/2016 2:04:08 PM | A | FAIL |
|
|
Shelly Phone #: ###-#### >verify abs glue is not cpvc glue, no glue can onsite >transition glue joint needs to be outside of building. >re test > need BLD permit
|
PLM16-01208
| Final | 5/25/2016 | 5/25/2016 | 5/25/2016 2:03:05 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Scott Wickstrom
|
PLM16-01165
| Final | 5/24/2016 | 5/25/2016 | 5/25/2016 1:39:29 PM | P | PASS |
|
|
Inspection requested via web by Brian Johansen
|
PLM16-00225
| Final | 5/24/2016 | 5/25/2016 | 5/25/2016 12:27:14 PM | A | PASS |
|
|
2125 ENTER Phone #: ###-#### Inspection requested via web by Ann Marie Reyes
|
PLM16-01112
| Final | 5/25/2016 | 5/25/2016 | 5/25/2016 12:10:33 PM | A | PASS |
|
|
Garage code is 1001. Phone #: ###-#### Inspection requested via web by David Stephenson
|
PLM16-01894
| Plumbing Rough-in | 5/25/2016 | 5/25/2016 | 5/25/2016 12:10:18 PM | P | PASS |
|
|
Ready now. Phone #: ###-#### Inspection requested via web by David Stephenson
|
PLM16-00803
| Water and/or Sewer | 5/24/2016 | 5/25/2016 | 5/25/2016 11:57:07 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Rob Bristol
|
PLM16-01049
| Final | 5/24/2016 | 5/25/2016 | 5/25/2016 11:56:49 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Rob Bristol
|
PLM16-01875
| DOC - Permit Finaled | 5/25/2016 | 5/25/2016 | 5/25/2016 11:38:16 AM | P | PASS |
|
|
|
PLM16-01875
| Med/Gas Systems | 5/24/2016 | 5/25/2016 | 5/25/2016 11:38:06 AM | A | PASS |
|
|
Kelly Phone #: ###-#### >20lb test ok
|
PLM16-01500
| Water Heater Final | 5/24/2016 | 5/25/2016 | 5/25/2016 11:20:09 AM | A | PASS |
|
|
Patrica home until 12:30
|
PLM16-01850
| Water and/or Sewer | 5/24/2016 | 5/25/2016 | 5/25/2016 11:00:29 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Vicki Tallent >need 2' of coverage over pipe at house >remove boulder sitting on sewer pipe >properly bed sewer >uncover to tie in >uncover water
|
PLM16-01878
| Water Heater Final | 5/24/2016 | 5/25/2016 | 5/25/2016 10:57:29 AM | A | FAIL |
|
|
WATER HEATER INSTALL - PLEASE CALL JULIE KEYE 30 MINUTES PRIOR TO ARRIVAL. Phone #: ###-#### Inspection requested via web by JEREMY LINK >T&P is back graded, spin T&P to eliminate backgrade so pipe does not sit full of water if dischage occurs. >send pic of repair.
|
PLM16-01681
| Sprinkler (Final) | 5/24/2016 | 5/25/2016 | 5/25/2016 10:30:20 AM | A | FAIL |
|
|
Chuck Phone #: ###-#### >uncover complete tee at tie in >insert fitting is not pushed in all the way and leaking at tie in >line from backflow to drain must be graded to drain down >certify RPBA >each barbed ftg needs two clamps
|
PLM16-01153
| Final | 5/24/2016 | 5/25/2016 | 5/25/2016 10:09:57 AM | A | FAIL |
|
|
Key is hidden above front door in ceiling. Phone #: ###-#### Inspection requested via web by chris mcdaniel >need to add an expansion tank since backflow was added >Add ASSE 1070 conforming tempering device to lav per 413.1 ISPC
|
PLM16-01876
| Water Heater Final | 5/24/2016 | 5/25/2016 | 5/25/2016 9:16:42 AM | A | PASS |
|
|
Please call ahead Glad Perrault ###-#### Phone #: ###-#### Inspection requested via web by Chris Field
|
PLM16-01760
| Plumbing Rough-in | 5/24/2016 | 5/25/2016 | 5/25/2016 8:56:59 AM | A | PASS |
|
|
Please call for key code access number if no one is there. Thanks. ###-#### Phone #: ###-#### Inspection requested via web by Josh Johnson
|
PLM16-01877
| Final | 5/24/2016 | 5/25/2016 | 5/25/2016 8:32:01 AM | A | FAIL |
|
|
Carl Phone #: ###-#### >need to pipe wh pan drain >T&P needs a 1" airgap or pipe to garge floor so it will be noticed if discharge is occuring.
|
PLM16-01864
| Groundwork | 5/24/2016 | 5/25/2016 | 5/25/2016 8:09:38 AM | A | PASS |
|
|
ANY QUESTIONS CALL TOM ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann
|