Inspections for the day of: Thursday, May 25, 2017.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorEric Story
TitleELE-INSPECTOR
Phone #985-3493
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE17-00485 Final5/25/20175/25/20175/25/2017 2:20:41 PMPFAIL
Jonny Phone #: ###-####
Need dishwasher installed and lockout for final
ELE17-01579 Conference5/25/20175/25/20175/25/2017 2:20:08 PMPDONE
TY Phone #: ###-####
Discussed layout and ALL codde requirements on beds and bath. Owner is aware of all codes needed
ELE17-01608 Final5/25/20175/25/20175/25/2017 1:01:18 PMPPASS
please call dan Phone #: ###-#### Inspection requested via web by Dan Rohl
Final ok
ELE17-01569 Electrical Rough-In5/25/20175/25/20175/25/2017 12:21:35 PMPPASS
We would like a rough in for cover on the ceilings that are going to be drywalled thank you Phone #: ###-#### Inspection requested via web by Brad Baker
Hard lid ceilings throughout ok cover
ELE16-00959 Final5/24/20175/25/20175/25/2017 10:48:13 AMAPASS
Ken Phone #: ###-####
Bathroom remodel final ok
ELE17-01354 Electrical Rough-In5/24/20175/25/20175/25/2017 9:51:23 AMAFAIL
Listing inspection for solar panel and inverter. Phone #: ###-#### Inspection requested via web by Ryan King
No one on site nor homeowner home, no verification was inspected
ELE16-03480 Final5/24/20175/25/20175/25/2017 9:26:16 AMAFAIL
Home is vacant lock box on front step rail 1978. Please call with any questions. In kitchen west side gfi is under sink. Thank you! Phone #: ###-#### Inspection requested via web by Josh Craig
210.12 AFCI for all bedrroms
ELE17-00852 Electrical Rough-In5/24/20175/25/20175/25/2017 8:57:18 AMAPASS
Call Chris for grid ceiling inspection at entrance D. As early in the morning as possible. Phone #: ###-#### Inspection requested via web by Rafael Castillo
Areas as noted on print ceilings ok cover
ELE17-00852 Final5/25/20175/25/20175/25/2017 8:57:10 AMAPART
Call Chris for grid ceiling inspection at entrance D. As early in the morning as possible. Phone #: ###-#### Inspection requested via web by Rafael Castillo
Area in that convention will be held ok to occupy, main area of construction will be tarped off so public cannot access it. ceilings were the only touched in this area and safe for public.