ELE05-01814
| Conference | 5/26/2005 | 5/26/2005 | 5/26/2005 4:34:21 PM | P | DONE |
|
|
jeremy ###-#### talked about u/g under slab and pullbox
|
ELE05-01682
| Electrical Rough-In | 5/26/2005 | 5/26/2005 | 5/26/2005 4:33:31 PM | P | NR |
|
|
Phone #: ###-#### Internet Inspection Request from: Tyler Bowen interior walls only ok to cover
|
ELE05-01744
| Electrical Rough-In | 5/26/2005 | 5/26/2005 | 5/26/2005 3:46:17 PM | P | PASS |
|
|
###-#### Andy\\ Pool Bonding called contr to bond both rails in bases ok to cover bonds
|
ELE05-01230
| Final | 5/26/2005 | 5/26/2005 | 5/26/2005 3:40:03 PM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 5/26/2005 at 10:33:32 AM. met with elect, left corr. notice, 110.26(A) (1) and (2) work space shall be provided about equipment for width and depth, 408.7 unused openings shall be closed in panelboard
|
ELE05-01831
| Electrical Rough-In | 5/24/2005 | 5/26/2005 | 5/26/2005 2:43:36 PM | P | PASS |
|
|
underground inspection// john ###-#### pool bond u/g cnd ok to cover
|
ELE05-00717
| Final | 5/26/2005 | 5/26/2005 | 5/26/2005 2:05:35 PM | P | PASS |
|
|
alex; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa ok to final
|
ELE05-01399
| Electrical Rough-In | 5/26/2005 | 5/26/2005 | 5/26/2005 1:35:33 PM | P | PASS |
|
|
underground insp for parking lot skip ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie ok to cover u/g for parking lot
|
ELE05-01097
| Final | 5/26/2005 | 5/26/2005 | 5/26/2005 1:06:37 PM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 5/26/2005 at 7:55:45 AM. Contact: ###-####. called, left message, left corr notice, 406.4(B) recpts shall be held rigidly, 410.12 outlet shall be covered(mbr light), 210.8(A)(2) garage gfci shall reset to c
|
ELE05-01468
| Final | 5/26/2005 | 5/26/2005 | 5/26/2005 10:44:55 AM | A | PASS |
|
|
final on pool enclosure; Phone #: ###-#### Internet Inspection Request from: todd hall ok to final, signed card
|
ELE04-02595
| Final | 5/26/2005 | 5/26/2005 | 5/26/2005 10:44:13 AM | A | PASS |
|
|
final for entire project; Phone #: ###-#### Internet Inspection Request from: todd hall ok to final, signed occ card
|
ELE05-01845
| Permanent Service | 5/25/2005 | 5/26/2005 | 5/26/2005 10:10:52 AM | A | CANC |
|
|
mike ###-#### see cloned inspection
|
ELE05-01840
| Permanent Service | 5/25/2005 | 5/26/2005 | 5/26/2005 8:46:44 AM | A | PASS |
|
|
chuck space #107; Phone #: ###-#### Internet Inspection Request from: Barbara Moore p/s u/g exst meter ok
|
ELE05-01575
| Final | 5/25/2005 | 5/26/2005 | 5/26/2005 8:28:51 AM | A | NR |
|
|
dennis ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie called contr, recpts not mounted, no covers, water heater not hooked up, ceiling fan open. Told to call when ready.
|
ELE05-00212
| Final | 5/25/2005 | 5/26/2005 | 5/26/2005 8:06:12 AM | A | PASS |
|
|
alan; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa ok to final
|
ELE05-00987
| Final | 5/25/2005 | 5/26/2005 | 5/26/2005 8:04:37 AM | A | PASS |
|
|
alan; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa ok to final
|
ELE05-00986
| Final | 5/25/2005 | 5/26/2005 | 5/26/2005 8:03:56 AM | A | PASS |
|
|
alan; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa ok to final
|
ELE05-01845
| Electrical Rough-In | 5/26/2005 | 5/26/2005 | 5/26/2005 12:00:00 AM | A | PASS |
|
|
mike ###-#### ok to cover u/g from pedestal to foundation
|