BLD04-02828
| FIRE-Final Inspection | 5/26/2005 | 5/26/2005 | 5/26/2005 4:00:37 PM | P | PASS |
|
|
Fire life safety finaled
|
FIR05-00057
| INSP-Final Inspection | 5/26/2005 | 5/26/2005 | 5/26/2005 3:27:27 PM | P | PASS |
|
|
Fire sprinkler finaled
|
FIR05-00149
| INSP-Sprinkler Rough-in | 5/26/2005 | 5/26/2005 | 5/26/2005 2:42:15 PM | P | FAIL |
|
|
###-####; Still need tenting corrected in bedroom as discussed.
|
FIR05-00219
| INSP-Final Inspection | 5/26/2005 | 5/26/2005 | 5/26/2005 2:05:30 PM | P | PASS |
|
|
permit finaled
|
BLD05-00590
| FIRE-Final Inspection | 5/25/2005 | 5/26/2005 | 5/26/2005 12:32:01 PM | A | FAIL |
|
|
Mount fire extinguishers in the warehouse. Two 4A are required or four 2A's. Change door hardware between dispatch and office or remove exit signs. Install door hardware for verification.
|
FIR05-00276
| INSP-Final Inspection | 5/25/2005 | 5/26/2005 | 5/26/2005 12:30:29 PM | A | PASS |
|
|
Fire alarm finaled
|
BLD04-02121
| FIRE-Final Inspection | 5/25/2005 | 5/26/2005 | 5/26/2005 11:28:33 AM | A | PASS |
|
|
Fire life safety finaled
|
BLD05-00288
| FIRE-Final Inspection | 5/25/2005 | 5/26/2005 | 5/26/2005 11:26:16 AM | A | PASS |
|
|
Fire life safety finaled
|
FIR05-00149
| INSP-Sprinkler Rough-in | 5/25/2005 | 5/26/2005 | 5/26/2005 11:25:34 AM | A | PART |
|
|
Piping ok to cover except in the south east bedroom
|
BLD05-01046
| FIRE-Final Inspection | 5/25/2005 | 5/26/2005 | 5/26/2005 9:22:48 AM | A | PASS |
|
|
Life safety finaled
|
FIR05-00056
| INSP-Final Inspection | 5/26/2005 | 5/26/2005 | 5/26/2005 12:00:00 AM | P | PASS |
|
|
Fire sprinkler finaled
|
FIR03-00586
| INSP-Conference | 5/26/2005 | 5/26/2005 | 5/26/2005 12:00:00 AM | P | DONE |
|
|
I spoke to Brian with AIC Solutions and let him know that all that is needed is the Knox Key box.
|
FIR04-00004
| INSP-Conference | 5/26/2005 | 5/26/2005 | 5/26/2005 12:00:00 AM | P | DONE |
|
|
I spoke to Jim with DeBest about job status. He said he would follow up.
|