Inspections for the day of: Tuesday, May 26, 2009.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR07-01031 INSP-Sprinkler Rough-in5/26/20095/26/20095/27/2009 3:00:09 PMPPASS
See the on site as-builts for locations with todays date where the sprinkler piping can be covered.
BLD09-00399 FIRE-Final Inspection5/26/20095/26/20095/26/2009 4:05:11 PMPPASS
LIfe safety passed.
BLD08-01210 FIRE-Final Inspection5/26/20095/26/20095/26/2009 4:00:56 PMPPART
A temporary occupancy is being given until 5/29/2009 with Jason Blaise, Mark Sentenno and Scott Areleno's permission. The Area of Refuge equipment needs to be installed and tested. The address has been changed from a Hartman street address to Liberty Street.
FIR09-00295 INSP-Alarm Testing5/21/20095/26/20095/26/2009 3:58:42 PMPPASS
Permit finaled. Mike is to provide me with as-builts
BLD08-01796 FIRE-Final Inspection5/22/20095/26/20095/26/2009 3:57:55 PMPFAIL
The project related fire alarm and fire sprinkler permits need addressed. I also noted that the building address was not installed and the one hour rated fire riser room did not have the piping penatrations fire caulked. No other items have been inspected.
BLD08-01797 FIRE-Final Inspection5/22/20095/26/20095/26/2009 3:57:34 PMPFAIL
The project related fire alarm and fire sprinkler permits need addressed. I also noted that the building address was not installed and the one hour rated fire riser room did not have the piping penatrations fire caulked. No other items have been inspected.
FIR08-00679 INSP-Final Inspection5/25/20095/26/20095/26/2009 3:46:21 PMAPASS
Permit finaled. The address has been changed from Hartman to Liberty.
FIR09-00168 INSP-Final Inspection5/22/20095/26/20095/26/2009 3:45:20 PMAFAIL
I tried to do this inpsection twice today. The first time paper work was missing such as the Inspection and Testing form, the NetCom signal strenght verification and the building map was incorrect. When I returned the required paper work was there but I found that the AES wireless transmitter that was installed was not the model number that was submitted and approved. Also when we tried to send a trouble signal no was transmitted and when a tamper switch was operated a water flow signal was transmitted to central station. The inspection was stopped and will need to be rescheduled after the correct transmitter is installed or plan review is contacted and approves this different model. Also all signals need to be verified.
FIR09-00133 INSP-Final Inspection5/22/20095/26/20095/26/2009 3:38:11 PMAFAIL
The forward flush passed but the interconnections with the fire alarm panel could not be tested due to problems with the facp.
BLD09-00389 FIRE-Final Inspection5/21/20095/26/20095/26/2009 11:00:01 AMAPASS
Life safety passed.