Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC09-00093 BMP Violation5/26/20095/26/20095/26/2009 4:47:54 PMPFAIL
TOld RP to meet with us tomorrow at 9:00am to go over all erosion ans sediment control provision that need to be impliments per there ESC plan approved by the city. Also need to post the ESC sign. Will re-inspect on 5/27/09 AM.
ESC08-00952 Complaint Inspection5/26/20095/26/20095/26/2009 4:45:08 PMPFAIL
Discussed with RP over the dust issues that are being generated with the earth work on the project area. Told RP that he needs to be more agressive with the use of there water truck. Left a message with the complaintee of what I discussed with the issue.
ESC09-00232 General Inspection5/20/20095/26/20095/26/2009 4:05:26 PMPPASS
ESC09-00045 General Inspection5/26/20095/26/20095/26/2009 3:16:55 PMPPASS
Site has has a hydro seed blend applied to all of the site. Will re-inspect in 2 months for a site final if vegitation has been astablished.
MIS09-00093 BLD-Conference5/26/20095/26/20095/26/2009 2:44:01 PMPDONE
Afted investigating the planter boxs that have been installed, there is no need for any permit since it is an exempted activity per 8-17. Will wait for the home owner to contact us to give them some recommendment for erosion control that can become an issue if not addressed from the seepiage of water from under the planter boxes.
ESC09-00217 Site Preparation5/26/20095/26/20095/26/2009 2:36:16 PM NR
ESC09-00164 General Inspection5/20/20095/26/20095/26/2009 2:35:57 PMADONE
ESC08-00952 BMP Violation5/20/20095/26/20095/26/2009 1:21:48 PMAPART
Entrance will be re-constructed once the screening machine is complete. Will be re-established by next week. Also D.I. will be cleaned out by the end of the day.
ESC09-00263 Site Preparation ESC5/26/20095/26/20095/26/2009 11:09:23 AM PASS
ESC07-00070 General Inspection5/26/20095/26/20095/26/2009 11:08:14 AMAPASS
Hydro seeding has been completed.
ESC07-01522 Site Final5/26/20095/26/20095/26/2009 10:30:38 AMAPASS
ESC09-00265 Site Preparation5/26/20095/26/20095/26/2009 9:12:47 AM NR