GCP10-00061
| GCP-Final | 5/25/2010 | 5/26/2010 | 5/27/2010 11:45:31 AM | A | PASS |
|
|
Scope of Inspection: FinalContact: Art @ ###-#### dcva tested ok...........ds
|
PLM10-00265
| Final | 5/26/2010 | 5/26/2010 | 5/26/2010 4:42:10 PM | P | PASS |
|
|
brian Phone #: ###-####
|
PLM10-01183
| Water Heater Final | 5/25/2010 | 5/26/2010 | 5/26/2010 4:16:33 PM | P | PASS |
|
|
Please call before arriving Inspection requested from web by: Tom Soniville Phone #: ###-####
|
MIS10-00145
| PLM-Conference | 5/26/2010 | 5/26/2010 | 5/26/2010 1:14:37 PM | A | PEND |
|
|
met with owner and discussed poor plumbing situation and unsanitary condition in connection with plumbing. Owner seemed to understand. There was some difficulty in trying to make him understand that I was just there for the plumbing issues. I told him he needs to hire plumber to repair plumbing so as to provide sanitary conditions at residence he is renting space to. .......................ds
|
PLM10-01103
| Plumbing Rough-in | 5/25/2010 | 5/26/2010 | 5/26/2010 12:03:53 PM | P | PASS |
|
|
job will be ready at 11:30 Inspection requested from web by: Boe Jares Phone #: ###-####
|
PLM10-00805
| Final | 5/25/2010 | 5/26/2010 | 5/26/2010 11:11:00 AM | A | PASS |
|
|
Inspection requested from web by: LANDON ADANK Phone #: ###-####
|
PLM10-01180
| Plumbing Rough-in | 5/25/2010 | 5/26/2010 | 5/26/2010 10:55:21 AM | A | PASS |
|
|
Rob Phone #: ###-#### - contractors are in the garage around back
|
PLM10-01181
| Plumbing Rough-in | 5/25/2010 | 5/26/2010 | 5/26/2010 9:09:42 AM | A | CANC |
|
|
Mark-must call at least 30 mins prior to inspection for access Phone #: ###-####
|
PLM10-01181
| Final | 5/26/2010 | 5/26/2010 | 5/26/2010 9:08:46 AM | A | PASS |
|
|
Mark-must call at least 30 mins prior to inspection for access Phone #: ###-####
|