FIR06-00331
| FIR-Aging Inspection | 5/26/2010 | 5/26/2010 | 6/3/2010 11:28:30 AM | | NR |
|
|
I spoke to Don and he going to follow up on job status and call me back. A follow up inspection has been scheduled for next week,
|
FIR03-00510
| INSP-Conference | 5/19/2010 | 5/26/2010 | 5/27/2010 8:16:32 AM | A | DONE |
|
|
Left voice mail for Bob at Oxard requesting project status. Phone ###-#### #110
|
FIR04-00375
| INSP-Conference | 5/19/2010 | 5/26/2010 | 5/27/2010 8:16:17 AM | A | DONE |
|
|
Left voice mail for Bob at Oxard requesting project status. Phone ###-#### #110
|
FIR04-00374
| INSP-Conference | 5/19/2010 | 5/26/2010 | 5/27/2010 8:16:01 AM | A | DONE |
|
|
Left voice mail for Bob at Oxard requesting project status. Phone ###-#### #110
|
FIR03-00381
| INSP-Conference | 5/19/2010 | 5/26/2010 | 5/27/2010 8:15:45 AM | A | DONE |
|
|
Left voice mail for Bob at Oxard requesting project status. Phone ###-#### #110
|
BLD09-00557
| FIRE-Final Inspection | 5/26/2010 | 5/26/2010 | 5/27/2010 7:46:07 AM | P | CANC |
|
|
Wrong inspection type called in. Herb needed fire alarm inspection.
|
BLD10-00415
| FIRE-Final Inspection | 5/26/2010 | 5/26/2010 | 5/26/2010 4:29:49 PM | P | PASS |
|
|
Life safety passed. The thumbturn lock on the east door will be removed prior to the building inspection
|
FIR09-00673
| INSP-Final Inspection | 5/26/2010 | 5/26/2010 | 5/26/2010 2:01:43 PM | P | PASS |
|
|
Permit finaled.
|
BLD09-00077
| FIRE-Final Inspection | 5/25/2010 | 5/26/2010 | 5/26/2010 1:54:55 PM | A | PASS |
|
|
Life safety passed.
|
BLD10-00912
| FIRE-Final Inspection | 5/25/2010 | 5/26/2010 | 5/26/2010 1:53:59 PM | A | PASS |
|
|
Life safety passed.
|
FIR09-00535
| INSP-Sprinkler Rough-in/Hydro | 5/24/2010 | 5/26/2010 | 5/26/2010 12:41:38 PM | A | PASS |
|
|
Jeff is looking for the original correction list. If all items have been met on that list then the remaining items are the signage as discussed and copies of the test papers.
|
FIR10-00060
| INSP-Alarm Testing | 5/25/2010 | 5/26/2010 | 5/26/2010 12:22:52 PM | A | DONE |
|
|
The items previously listed have been corrected. Duct smoke detectors have been tested for hvac shutdown. EOL voltage was verified. Two smoke detectors were tested for operation that operate roll down fire doors. They were not approved for location only for function. They are not shown on the city approved plans. They are to be included on the revised plans. Items remaining for phase I include the 135cd strobe and the repair of the corridor roll down fire door.
|
FIR09-00707
| INSP-Final Inspection | 5/25/2010 | 5/26/2010 | 5/26/2010 12:19:04 PM | A | FAIL |
|
|
The alarm interconnection for the devices located in phase I were tested today. It appears the only outstanding item for phase I is the forward flush failed.
|
FIR10-00118
| INSP-Final Inspection | 5/25/2010 | 5/26/2010 | 5/26/2010 12:17:19 PM | A | PASS |
|
|
The hood suppression system operated correctly. Permit finaled.
|
BLD09-01611
| FIRE-Final Inspection | 5/25/2010 | 5/26/2010 | 5/26/2010 12:15:37 PM | A | PASS |
|
|
Revised drawings have been provided and approved which show the new fire hydrant being deleted. Life safety passed.
|