Inspections for the day of: Thursday, May 26, 2011.
Number of inspections: 6
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR11-00137 INSP-Final Inspection5/26/20115/26/20115/26/2011 5:13:49 PMPPART
Final pending installation matching approved plans. Drawings indicate 1 1/2" piping to supply the new pendent heads. Field install was completed using 1". Provide revised plans or modify work to reflect the design.
FIR08-00239 INSP-Sprinkler Rough-in5/26/20115/26/20115/26/2011 4:53:46 PMPPART
OH piping at building #3 east stairway floors basement thru 3rd floor okayed for cover.
BLD11-00581 FIRE-Final Inspection5/26/20115/26/20115/26/2011 4:51:46 PMPPASS
Life safety inspection passed. Fire extinguisher posted as discussed.
FIR11-00146 INSP-Final Inspection5/25/20115/26/20115/26/2011 4:50:34 PMPPASS
Fire alarm work passed field testing. Permit finaled.
FIR10-00137 INSP-Alarm Testing5/25/20115/26/20115/26/2011 4:48:51 PMAPART
Completed testing of ID and DD devices at the basement levels. Noted tamper valve at the elevator machine room to be monitored, as-builts to reflect deleted and added devices, dampers have been repaired and verified for functionality. Previously noted correction items underway, some are finished. Ref. plan set for annotations.
FIR11-00170 INSP-Sprinkler Rough-in5/25/20115/26/20115/26/2011 4:43:01 PMACANC
See stamped plans for overhead work at grid ceilings okayed for cover marked with today's date.