ELE11-00931
| ELE-Aging Inspection | 5/26/2015 | 5/26/2015 | 5/29/2015 2:22:06 PM | | DONE |
|
|
left another message
|
ELE15-01520
| Temporary Service | 5/26/2015 | 5/26/2015 | 5/26/2015 4:06:34 PM | P | PASS |
|
|
temp pole Phone #: ###-#### Inspection requested via web by Stephen Kren t/s o/h n ok NOTE; I LET CONTRACTOR KNOW METER NEEDS TO BE 5 ' 6" to center + or - 6" from now on
|
ELE12-02746
| Final | 5/22/2015 | 5/26/2015 | 5/26/2015 2:52:15 PM | A | FAIL |
|
|
Any questions get ahold of Tony Young 332.12- nm cable subject to physical damage needs sleeve to furnace.
|
GCE15-00040
| GCE-Final | 5/26/2015 | 5/26/2015 | 5/26/2015 2:08:31 PM | P | FAIL |
|
|
Terry ###-#### too many items to list not ready
|
ELE15-00561
| Final | 5/26/2015 | 5/26/2015 | 5/26/2015 1:06:09 PM | A | PASS |
|
|
Inspection requested via web by Mike Swift final ok ceilings included
|
ELE14-03488
| Permanent Service | 5/25/2015 | 5/26/2015 | 5/26/2015 12:30:59 PM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton 250.68-Install nuetral disconnect link or bonding jumper for nuetral at main disconnect. 110.24- fault currents need to be labeled with date from Idaho Power on main disconnect. 110.16-arc flash warning label required on panels and main. Slip joint coupling required on secondary underground conduit with sch 80 conduit. Install bonding bushing at main disconnect.
|
ELE15-00169
| Electrical Rough-In | 5/22/2015 | 5/26/2015 | 5/26/2015 11:38:29 AM | A | NR |
|
|
steve hook is contact, ###-####, 1st and 2nd floor final. Phone #: ###-#### Inspection requested via web by Debby Pierce partial final on 1st floor needs missing covers and lost nuetral in south office receptacles
|
ELE15-00900
| Final | 5/21/2015 | 5/26/2015 | 5/26/2015 10:52:43 AM | A | PASS |
|
|
I would like an inspection for ground bushing at panel to be completed at 12:00 PM. because of Idaho Power. Phone #: ###-#### Inspection requested via web by Kevin Koomler ground bushing installed final ok
|
ELE15-01518
| Final | 5/25/2015 | 5/26/2015 | 5/26/2015 10:20:40 AM | A | NR |
|
|
call for access. Phone #: ###-#### Inspection requested via web by michael hunt not ready for final need 2 pole breaker and threaded connection for intersystem bond and label directory
|
ELE15-01518
| Permanent Service | 5/26/2015 | 5/26/2015 | 5/26/2015 10:11:05 AM | P | PASS |
|
|
call for access. Phone #: ###-#### Inspection requested via web by michael hunt p/s o/h rec ok upgraded from 100amp to 200 amp
|
ELE14-03316
| Electrical Rough-In | 5/22/2015 | 5/26/2015 | 5/26/2015 9:09:56 AM | A | PASS |
|
|
Contact Tpm Hartung for level 1 garage roof deck rough in. Phone #: ###-#### Inspection requested via web by Tom Betty r/i ok parking ceiling orange area
|