FIR13-00167
| INSP-Sprinkler Rough-in/Hydro | 5/26/2015 | 5/26/2015 | 5/26/2015 2:37:13 PM | P | PART |
|
|
FS U/G hydrotest - 9th street connection. 200psi @ 2 hours - from PIV at street to first control valve in basement (8" x approx. 100ft.) PASSED. NOTE: 11th St. tie-in not tested yet.
|
FIR15-00096
| INSP-Sprinkler Rough-in/Hydro | 5/22/2015 | 5/26/2015 | 5/26/2015 12:13:04 PM | A | PART |
|
|
3rd floor east wing insulation inspection, including units 301, 302, 303, 304, 305, 306, 307, 308,, 309, 310, 311, 312, 313, 314, 316, 343, and 344. Rich - GC ###-####
|
FIR14-00815
| INSP-Sprinkler Rough-in/Hydro | 5/22/2015 | 5/26/2015 | 5/26/2015 8:55:44 AM | A | PART |
|
|
This is a rough in inspection that was mistakenly entered under FIR14-00866 on 5/20 for completion on 5/21. It needs to be completed under this FIR# and is for the soffits on Level 4, Section 3 Units included in this inspection are 417, 418, 419, 420, 421, 422, 423, 424, 425, 426, 427, 428, 429 and 430..
|