FIR17-00001
| INSP-Sprinkler Rough-in/Hydro | 5/25/2017 | 5/26/2017 | 5/26/2017 12:21:42 PM | P | PART |
|
|
Hydrostatic test complete for level 3, rough in inspection complete, piping cannot be covered until tenting inspection is complete.
|
FIR16-00774
| INSP-Sprinkler Rough-in | 5/26/2017 | 5/26/2017 | 5/26/2017 12:14:22 PM | P | PART |
|
|
Rough to cover inspection for overhead fire sprinkler piping/tenting complete, noted that the garages have fire sprinkler piping/heads installed, some piping is located in attic spaces, this piping is tented with plastic sheeting but no insulation installed over the top, a minimum of R38 insulation needs to installed over fire sprinkler piping, fire sprinkler piping located in attic spaces in garages cannot be covered until insulation install is verified. All garages will need to have active conditioning installed to keep the fire sprinkler pipe/heads from freezing.
|
FIR17-00102
| INSP-Sprinkler Rough-in | 5/25/2017 | 5/26/2017 | 5/26/2017 11:15:31 AM | P | PASS |
|
|
Rough to cover inspection for underground complete, approved for cover.
|
FIR15-00838
| INSP-Sprinkler Rough-in/Hydro | 5/25/2017 | 5/26/2017 | 5/26/2017 11:04:28 AM | A | PASS |
|
|
Underground re-hydro tested due to developed leak from seperate contractor impacting thrust block. Restraints have been installed to protect underground from seperation due to site work and underground re-hydro complete.
|
FIR16-00088
| INSP-Sprinkler Rough-in/Hydro | 5/24/2017 | 5/26/2017 | 5/26/2017 11:04:10 AM | A | PASS |
|
|
Underground re-hydro tested due to developed leak from seperate contractor impacting thrust block. Restraints have been installed to protect underground from seperation due to site work and underground re-hydro complete.
|