BLD03-00300
| BLD-Framing/Rough-in | 5/23/2003 | 5/27/2003 | 5/27/2003 12:00:00 AM | A | PART |
|
|
mitch; Phone #: ###-#### Internet Inspection Request from: Barbara Moorepending detail from architect for entry.contractor on site notified said detail would be coming.and he will call for re-insp asap. 5/27/2003 11:58:09 AM
|
BLD02-02435
| BLD-Framing/Rough-in | 5/27/2003 | 5/27/2003 | 5/27/2003 12:00:00 AM | P | PART |
|
|
DENNIS; Phone #: ###-#### Internet Inspection Request from: Darla Downs. Unable to locate framer will try am inspedction talked with contractor on phone, note a fire stop a the 2nd floor hvac would be required. 5/27/2003 5:25:08 PM
|
BLD03-00294
| BLD-Final | 5/27/2003 | 5/27/2003 | 5/27/2003 12:00:00 AM | P | PASS |
|
|
###-####ok for a perm oc. 5/27/2003 5:20:08 PM
|
BLD02-01073
| BLD-Framing/Rough-in | 5/27/2003 | 5/27/2003 | 5/27/2003 12:00:00 AM | P | FAIL |
|
|
vincent 1st layer dry wall cover; Phone #: ###-#### Internet Inspection Request from: Barbara Moore. Note: nothing shown on approved plans indicating drywall nailing/screwing, only indicates a double 5/8" lid, UBC , code would require screws for this assembly. Contractor is now adding screws and wil recall. 5/27/2003 5:28:00 PM
|
BLD03-00528
| BLD-Footing | 5/27/2003 | 5/27/2003 | 5/27/2003 12:00:00 AM | P | PASS |
|
|
jay; Phone #: ###-#### Internet Inspection Request from: Barbara Moore. wip soils engineer has done a geo tec report all is good and was out this afternoon after excavation, he informed contractor on site all was ok, will be forwarding a letter prior to a foundation wall inspection, I have myself talked with him at first inspection and prior to him going out. 5/27/2003 5:23:55 PM
|
MEC03-01307
| Pressure Test | 5/22/2003 | 5/27/2003 | 5/27/2003 12:00:00 AM | P | CANC |
|
|
###-#### christine. no pt done existing pipe., 5/27/2003 2:27:04 PM
|
MEC03-01307
| Final | 5/22/2003 | 5/27/2003 | 5/27/2003 12:00:00 AM | P | PASS |
|
|
###-#### christine
|