Inspections for the day of: Friday, May 27, 2005.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD04-02947 FIRE-Final Inspection5/27/20055/27/20055/27/2005 12:30:23 PMPFAIL
Provide suite number, provide signage or painting of the curbing for fire dept access and provide locking hardware that has the indicators.
BLD04-02946 FIRE-Final Inspection5/27/20055/27/20055/27/2005 12:28:44 PMPPASS
Life safety finaled
BLD05-00592 FIRE-Final Inspection5/27/20055/27/20055/27/2005 12:18:07 PMPPASS
life safety finaled
FIR05-00189 INSP-Conference5/27/20055/27/20055/27/2005 12:10:43 PMPDONE
Remote annunciator is ok to relocate roughly 8' away from the original location. It will still be located in the entrance lobby.
BLD05-00264 FIRE-Final Inspection5/26/20055/27/20055/27/2005 10:56:27 AMACANC
Contractor needs to final the original shell permit prior to finaling of the tenant space.
FIR05-00137 INSP-Final Inspection5/26/20055/27/20055/27/2005 10:55:21 AMAPASS
Fire sprinklers finaled
FIR05-00143 INSP-Final Inspection5/26/20055/27/20055/27/2005 10:54:56 AMAPASS
Fire alarm permit finaled. I had the fire alarm guys change a 30cd ceiling mount a/v in the lab area to a 95 to meet nfpa 72 spacing requirements. The location of the EOL was also changed.
BLD05-00590 FIRE-Final Inspection5/26/20055/27/20055/27/2005 7:40:38 AMAPASS
Fire life safety finaled